Overview
The GE DS200HSTIG1AAA, also known as the High-Speed Trip Interface Board (HSTI), is a critical component of the GE Mark V SPEEDTRONIC turbine control system. Its primary function is to process high-speed trip signals from turbine speed sensors, ensuring rapid detection of overspeed conditions. This capability is essential for the protection of gas and steam turbines, safeguarding the turbine from damage by triggering immediate shutdowns during dangerous conditions.
Engineered for high-speed signal processing, the DS200HSTIG1AAA interfaces with the control system, offering reliable turbine protection in demanding industrial environments, such as power generation plants and petrochemical facilities. It supports both simplex and redundant Mark V configurations, providing enhanced flexibility and reliability.
Technical Data
| Parameter | Specification |
|---|---|
| Part Number | DS200HSTIG1AAA |
| Product Type | High-Speed Trip Interface Board (HSTI) |
Typical Applications
The DS200HSTIG1AAA is widely deployed in various turbine control applications, including:
-
Gas turbine overspeed protection in combined‑cycle power plants.
-
Steam turbine trip systems for industrial and utility generation.
-
High-speed signal interfacing in petrochemical and refining facilities.
-
Redundant Mark V configurations requiring fast trip response.
In these environments, the board plays a vital role in ensuring rapid response to turbine speed signals, thereby preventing mechanical damage from overspeed conditions.
Key Features
-
High-speed trip processing for overspeed protection, ensuring immediate turbine shutdown when necessary.
-
Four terminal blocks for flexible wiring, accommodating various system configurations.
-
LED indicators for status monitoring and diagnostics, making troubleshooting easier.
-
Rugged design for continuous operation in harsh industrial environments, ensuring system reliability under demanding conditions.
-
Compatible with simplex, dual, or triple redundant Mark V systems, providing flexibility for different turbine control configurations.
FAQ
Q1: What is the primary role of the DS200HSTIG1AAA board?
It processes turbine speed signals to provide overspeed trip protection in GE Mark V systems. By detecting overspeed conditions quickly, it triggers an immediate shutdown to protect the turbine.
Q2: How does it improve system safety?
The HSTI board ensures rapid detection of overspeed, allowing for immediate turbine shutdown. This prevents mechanical damage caused by excessive speeds, safeguarding both the equipment and operators.
Q3: What components are included on the board?
The DS200HSTIG1AAA includes terminal blocks, LED indicators, integrated circuits, resistor networks, diodes, and capacitors, ensuring reliable signal processing and control.
Q4: Is it compatible with redundant systems?
Yes, the board supports simplex, dual, and triple modular redundant configurations, enhancing system reliability in redundant Mark V setups.
Q5: Why choose GE HSTI boards?
GE HSTI boards offer proven reliability, fast response times, and global support, making them an ideal choice for turbine protection in mission-critical applications.
| Cotizaciones Rápidas | Reciba precio y disponibilidad RÁPIDO de nuestro equipo dedicado de servicio al cliente. |
|---|---|
| Entrega | Envío Rápido, de Carga y Internacional Disponible. |
| Condición | 100% Nuevo con Paquete Original |
| Pago | Aceptamos American Express, Discover, MasterCard, PayPal y Visa. Nuestro sitio está asegurado por RapidSSL. |
| Puerto de Envío | ShangHai, Xiamen |
| Garantía | 12 Meses |
| P: ¿Nuestros precios son competitivos? |
| A: Sí, colaboramos con más de 50 países en todo el mundo. Como uno de los principales proveedores en China, ofrecemos descuentos significativos basados en las tendencias del mercado. |
| P: ¿Cuál es el período de garantía? |
| A: Todos nuestros productos nuevos y originales cuentan con una garantía estándar de un año. |
| P: ¿Qué métodos de pago aceptamos? |
| A: Requerimos el pago del 100% por T/T (Transferencia telegráfica) antes del envío. Para artículos con tiempo de entrega, se necesita un depósito del 30% por adelantado y el 70% restante antes del envío. Si tiene un representante en China, puede organizar una transferencia en RMB a través de él. |
| P: ¿Qué métodos de envío utilizamos? |
| A: Principalmente usamos FedEx, DHL, UPS y BRE para el envío. Si tiene una cuenta con alguno de estos transportistas, puede gestionar el envío directamente. También ofrecemos envío gratuito a agentes de carga con base en China. |
| P: ¿Cuál es nuestro tiempo de entrega? |
| A: La entrega suele tardar de 1 a 3 días después de recibir el pago inicial. Para artículos con tiempo de entrega, el envío se realizará según el calendario especificado. |
| P: ¿Cómo embalamos los productos? |
| A: Garantizamos un embalaje seguro con múltiples capas de protección. Los productos se colocan primero en sus cajas originales y se sellan con etiquetas. Luego se añade una capa de plástico de burbujas para proteger contra colisiones durante el transporte. Finalmente, los artículos se empacan de forma segura en cajas resistentes. |
| P: ¿Cómo pueden los clientes contactarnos y solicitar una cotización? |
| A: Puede contactarnos por correo electrónico, WhatsApp, WeChat, Skype o su plataforma de comunicación preferida. Contáctenos con sus necesidades y le proporcionaremos una cotización rápida y personalizada. |
