ABB IMASI03 Symphony Infi 90 Analog Input Slave Module
The ABB IMASI03, also cataloged as the IMASI-03 Analog Input Slave Module, operates as a dedicated hardware component for digitizing analog field signals and routing process data to primary processing units within ABB Bailey Symphony Infi 90 DCS platforms.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | IMASI03 (IMASI-03 / ASI03) |
| Brand | ABB / Bailey |
| Origin | United States |
| Weight | 0.7 kg (1.6 lbs) |
| Dimensions | 33.0 cm x 5.1 cm x 17.8 cm (13.0 in x 2.0 in x 7.0 in) |
| Operating Temp | 0 to 60 deg C |
| Power Consumption | Power supplied via backplane P1 connector |
| Input Channels | 16 independently configured analog inputs |
| Input Signal Types | 4-20 mA current, -10 VDC to +10 VDC voltage, -100 mV to +100 mV / 0 to 100 mV millivolt |
| Temperature Sensor Support | Thermocouples (E, J, K, L, N, R, S, T, U); RTDs (10 ohm, 53 ohm, 100 ohm, 120 ohm, 3-wire) |
| ADC Resolution | Programmable 16 to 24 bits |
| Bus Interface | Slave expander bus to IMMFP01 / IMMFP02 / IMMFP03 processor via P2 connector |
| Form Factor | Single PCB, occupies one slot in Module Mounting Unit (MMU) |
| Addressing | Hardware DIP switches for slave address setting |
| Diagnostics | Status LEDs for module health and onboard tests; open-input detection |
| Tariff Code | 8538908180 |
Backplane Bus Communication Velocity & Channel-to-Channel Isolation
The ABB IMASI03 routes digitized sensor data across the slave expander bus directly to the primary Multi-Function Processor module. Integrated A/D conversion circuitry allows high-resolution signal quantization up to 24 bits. Channel-to-channel isolation coupled with open-input detection protects upstream backplane bus communication velocity and logic processing circuits from field ground loops or broken sensor wire faults.
Frequently Asked Questions
Q: How does the IMASI03 module interface with the main system controller?
A: The module connects via its rear P2 edge connector to the slave expander bus, transmitting digitized analog input data directly to host processors such as the IMMFP01, IMMFP02, or IMMFP03.
Q: What physical inputs are required for measuring thermocouple and RTD temperature sensors?
A: Field wiring connects through the P3 connector to external termination units or modules, supporting various thermocouple types and 3-wire RTD configurations with automatic software linearisation.
Q: How is the hardware address assigned on the module mounting rack?
A: Module slave addressing is set manually using on-board DIP switches located directly on the single PCB prior to inserting the card into the Module Mounting Unit.
Field Installation Guidelines
- Verify that the Module Mounting Unit power supply is de-energized or follow system-specific hot-swap safety protocols before inserting the card into its designated rack slot.
- Set the module DIP switch addressing and jumper configurations strictly according to system loop drawings prior to physical slot installation.
- Route field input wiring through proper termination cables connected to P3, maintaining separate conduit channels for 4-20 mA current loops and low-level thermocouple/mV signals to minimize inductive coupling.
- Connect all shield drain wires to the system cabinet earth ground bus at a single point to maintain signal integrity and prevent ground loop interference.
| Quick Quotes | Receive price & availability FAST from our dedicated customer service team. |
|---|---|
| Delivery | Expedited, Freight, And International Shipping Available. |
| Condition | 100% New with Original Package |
| Payment | We accept American Express, Discover, MasterCard, PayPal, and Visa. Our site is secured by RapidSSL. |
| Shipping Port | ShangHai, Xiamen |
| Warranty | 12 Months |
| Q: Is Our Pricing Competitive? |
| A: Yes, we collaborate with over 50 countries worldwide. As a top supplier in China, we offer significant discounts based on market trends. |
| Q: What Is the Warranty Period? |
| A: All our new and original products come with a standard one-year warranty. |
| Q: What Payment Methods Do We Accept? |
| A: We require 100% T/T (Telegraphic Transfer) payment before shipping. For items with a lead time, a 30% deposit is needed upfront, and the remaining 70% is due before shipping. If you have a representative in China, you can arrange an RMB transfer through them. |
| Q: What Shipping Methods Do We Use? |
| A: We primarily use FedEx, DHL, UPS, and BRE for shipping. If you have an account with any of these carriers, you can handle shipping directly. We also offer free shipping to China-based freight forwarders. |
| Q: What Is Our Delivery Time? |
| A: Delivery usually takes 1-3 days after receiving the initial payment. For items with a lead time, shipping will occur according to the specified schedule. |
| Q: How Do We Package the Goods? |
| A: We ensure safe packaging with multiple layers of protection. Products are first placed in their original boxes and sealed with labels. A layer of bubble wrap is then added for collision protection during transit. Finally, the items are packed securely in durable boxes. |
| Q: How Can Customers Contact Us and Request a Quote? |
| A: You can reach out to us via email, WhatsApp, WeChat, Skype, or your preferred communication platform. Contact us with your needs, and we'll provide a prompt, customized quote. |
