Allen-Bradley 1769-L30ER CompactLogix 5370 L3 Controller
The Allen-Bradley 1769-L30ER, also cataloged as the 1769-L30ER CPU Processors, operates as a dedicated hardware component for real-time task control and network communication processing within Allen-Bradley CompactLogix 5370 L3 systems.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | 1769-L30ER |
| Brand | Allen-Bradley / Rockwell Automation |
| Origin | USA / Mexico |
| Weight | 0.31 kg (0.68 lbs) |
| Dimensions | 55.00 mm x 118 mm x 105 mm |
| Operating Temp | 0 to 60 deg C |
| Power Consumption | 4.5 W max power dissipation |
| Current Draw | 500 mA at 5 VDC, 225 mA at 24 VDC |
| User Memory | 1 MB (includes 1 GB 1784-SD1 card, supports up to 2 GB) |
| Local Expansion Capacity | Up to 8 local 1769 Compact I/O modules |
| I/O Module Banks | Max 3 banks |
| Isolation Voltage | 30 V continuous (basic insulation), USB/Ethernet to system |
| Power Supply Distance Rating | 4 modules (Controller and 1769-SDN) |
| Mounting Type | DIN rail or panel mount (M4 or #8 screw torque 1.1 to 1.8 N m) |
Backplane Bus & Deterministic Network Execution
The processor coordinates real-time data transfers across backplane bus communication velocity limits while directing motion and logic sequences across Profinet / EtherNet/IP deterministic networks. Dual integrated Ethernet interfaces execute high-speed cyclic data exchange across ring topologies, protecting signal propagation against single-cable drops. Internal firmware flash compatibility ensures continuous task synchronization across expanding hardware builds, while backplane logic management maintains systematic I/O density scaling across up to 8 local 1769 expansion units.
Frequently Asked Questions
Q: What power supply distance rating governs module placement relative to the controller?
A: The controller features a power supply distance rating of 4. You must position the controller within 4 slots of an external 1769 power supply (such as 1769-PA2 or 1769-PB2) on the backplane rail to avoid voltage degradation across logic circuits.
Q: Can the nonvolatile memory card be replaced with a higher capacity card during operation?
A: The controller ships with a 1 GB 1784-SD1 card and supports up to a 2 GB 1784-SD2 card. Card removal or insertion must occur while the slot is inactive or powered down to prevent corruption of stored ladder logic, tags, and execution firmware.
Field Installation Guidelines
Position the controller on an IEC standard DIN rail or secure it to a metal backpanel using M4 or #8 screws tightened to a torque of 1.1 to 1.8 N m (10 to 16 lb in). Ensure clear vertical spacing of at least 50 mm above and below the assembly to facilitate natural air convection between 0 and 60 deg C.
Supply 24 VDC auxiliary power through an approved 1769 power supply module, using copper wire rated for 90 deg C. Strip line insulation cleanly and verify solid screw connections to minimize bus voltage drops across the local chassis.
Connect Ethernet communication drops using shielded CAT5e or CAT6 industrial cables. Route signal lines through distinct conduit paths isolated from high-voltage AC lines and drive cabling, anchoring shield terminations directly to the primary panel ground bus.
| Quick Quotes | Receive price & availability FAST from our dedicated customer service team. |
|---|---|
| Delivery | Expedited, Freight, And International Shipping Available. |
| Condition | 100% New with Original Package |
| Payment | We accept American Express, Discover, MasterCard, PayPal, and Visa. Our site is secured by RapidSSL. |
| Shipping Port | ShangHai, Xiamen |
| Warranty | 12 Months |
| Q: Is Our Pricing Competitive? |
| A: Yes, we collaborate with over 50 countries worldwide. As a top supplier in China, we offer significant discounts based on market trends. |
| Q: What Is the Warranty Period? |
| A: All our new and original products come with a standard one-year warranty. |
| Q: What Payment Methods Do We Accept? |
| A: We require 100% T/T (Telegraphic Transfer) payment before shipping. For items with a lead time, a 30% deposit is needed upfront, and the remaining 70% is due before shipping. If you have a representative in China, you can arrange an RMB transfer through them. |
| Q: What Shipping Methods Do We Use? |
| A: We primarily use FedEx, DHL, UPS, and BRE for shipping. If you have an account with any of these carriers, you can handle shipping directly. We also offer free shipping to China-based freight forwarders. |
| Q: What Is Our Delivery Time? |
| A: Delivery usually takes 1-3 days after receiving the initial payment. For items with a lead time, shipping will occur according to the specified schedule. |
| Q: How Do We Package the Goods? |
| A: We ensure safe packaging with multiple layers of protection. Products are first placed in their original boxes and sealed with labels. A layer of bubble wrap is then added for collision protection during transit. Finally, the items are packed securely in durable boxes. |
| Q: How Can Customers Contact Us and Request a Quote? |
| A: You can reach out to us via email, WhatsApp, WeChat, Skype, or your preferred communication platform. Contact us with your needs, and we'll provide a prompt, customized quote. |
