Triconex 4000093-310 Cable Assembly
The Triconex 4000093-310 is an input terminal cable assembly for Triconex Tricon safety-instrumented systems, connecting external termination panels to Tricon I/O modules across a 0 to 60 deg C operating range. It carries field signal interconnections within control cabinets and is listed with a 10 ft (approx. 3.05 m) length in supplier specifications.
Signal Interconnection and Panel Pairing
In Tricon triple-modular redundant (TMR) architectures, the cable links field-side external termination assemblies to controller I/O modules so external signals reach the safety system cleanly. Shielded construction helps limit electrical noise along internal cabinet runs.
According to the provided Triconex product guide details, the 4000093-310 applies to termination panel configurations including 9553-610, 9563-810, 9566-710, and 9566-810. Confirm exact I/O module pairing and panel wiring assignments for your Tricon revision before installation.
Cabinet Routing and Selection Checks
Route the cable assembly inside the control cabinet with appropriate bend radius and strain relief, avoiding high-voltage power conductors where possible. Verify required cable length (10 ft / approx. 3.05 m supplier-listed), connector fitment, and operating temperature limits (0 to 60 deg C) against your panel layout before ordering.
Technical Specifications
| Parameter | Specification |
|---|---|
| Model | 4000093-310 |
| Brand | Triconex |
| Product Type | Input Terminal Cable Assembly |
| System | Tricon TMR Controller |
| Cable Family | 4000093 Series |
| Connection Path | External Termination Panel to Tricon I/O Module |
| Associated Termination Panels | 9553-610, 9563-810, 9566-710, 9566-810 |
| Cable Length | 10 ft (3.05 m, supplier-listed) |
| Operating Temperature | 0 to 60 deg C |
Frequently Asked Questions
Q: What is the function of the Triconex 4000093-310 cable assembly? A: It connects external termination panels to Tricon I/O modules in Tricon safety control systems to carry field signal interconnections. Verify compatible termination panels and I/O module types for your specific Tricon configuration before installation.
Q: Which termination panels are listed with the 4000093-310? A: The provided product guide details list configurations including 9553-610, 9563-810, 9566-710, and 9566-810. Confirm exact panel model numbers and revision compatibility against your system drawings before ordering.
Q: What should technicians check when installing the 4000093-310 in a cabinet? A: Check the 10 ft (approx. 3.05 m) supplier-listed length against cabinet routing paths, observe 0 to 60 deg C operating temperature limits, and confirm secure connector seating. Follow your Tricon installation drawings for physical cable routing and support.
| Quick Quotes | Receive price & availability FAST from our dedicated customer service team. |
|---|---|
| Delivery | Expedited, Freight, And International Shipping Available. |
| Condition | 100% New with Original Package |
| Payment | We accept American Express, Discover, MasterCard, PayPal, and Visa. Our site is secured by RapidSSL. |
| Shipping Port | ShangHai, Xiamen |
| Warranty | 12 Months |
| Q: Is Our Pricing Competitive? |
| A: Yes, we collaborate with over 50 countries worldwide. As a top supplier in China, we offer significant discounts based on market trends. |
| Q: What Is the Warranty Period? |
| A: All our new and original products come with a standard one-year warranty. |
| Q: What Payment Methods Do We Accept? |
| A: We require 100% T/T (Telegraphic Transfer) payment before shipping. For items with a lead time, a 30% deposit is needed upfront, and the remaining 70% is due before shipping. If you have a representative in China, you can arrange an RMB transfer through them. |
| Q: What Shipping Methods Do We Use? |
| A: We primarily use FedEx, DHL, UPS, and BRE for shipping. If you have an account with any of these carriers, you can handle shipping directly. We also offer free shipping to China-based freight forwarders. |
| Q: What Is Our Delivery Time? |
| A: Delivery usually takes 1-3 days after receiving the initial payment. For items with a lead time, shipping will occur according to the specified schedule. |
| Q: How Do We Package the Goods? |
| A: We ensure safe packaging with multiple layers of protection. Products are first placed in their original boxes and sealed with labels. A layer of bubble wrap is then added for collision protection during transit. Finally, the items are packed securely in durable boxes. |
| Q: How Can Customers Contact Us and Request a Quote? |
| A: You can reach out to us via email, WhatsApp, WeChat, Skype, or your preferred communication platform. Contact us with your needs, and we'll provide a prompt, customized quote. |
