ABB 3HAC3616-1 DSQC 500 Main Computer Board
The ABB 3HAC3616-1, also cataloged as the DSQC 500 Main Computer Board, operates as a dedicated central processing unit for system management, trajectory computation, and peripheral communication across ABB S4C+ controller platforms.
Suffix Breakdown & Model Matrix
- DSQC 500: Base hardware designation identifying the central processor architecture and bus interface layout for S4C+ controller systems.
- 3HAC3616-1: Specific part number identifying the factory-configured main computer board variant equipped with socketed memory cards.
- 3HAC14279-1: Alternate replacement part identifier associated with specific hardware revisions of the processing assembly.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | DSQC 500 |
| Brand | ABB |
| Part Number | 3HAC3616-1 |
| Origin | Sweden / United States |
| Weight | 0.97 kg |
| Dimensions | 340 mm x 150 mm x 40 mm |
| Operating Temp | Refer to relevant ABB S4C+ manual |
| Power Consumption | Controller-internal backplane distribution |
| Primary Function | Central processing and controller system management |
| Compatible Controller | ABB S4C+ Series |
Profinet and Deterministic Network Communication
The processor board manages internal backplane communication velocity, coordinating high-speed data exchanges between axis computers and I/O subsystems. Firmware flash compatibility ensures strict synchronization with installed S4C+ system software versions, preserving deterministic network integrity and motion execution profiles.
Frequently Asked Questions
Q: Can the main computer board be replaced while the controller cabinet is energized?
A: No. Main power must be completely disconnected and isolated from the controller before extracting or inserting the processor board to prevent electrical damage to backplane traces.
Q: Is system software re-installation required following a board swap?
A: Yes. The replacement board requires loading the appropriate system software version matching the robot cell configuration via the service port.
Q: How is memory retention handled during power cycles?
A: Integrated battery-backed SRAM modules on the processor board preserve system parameters and temporary user routines during standard power down sequences.
Field Installation Guidelines
- Ensure complete isolation of all mains power feeding the controller cabinet prior to opening internal protective covers.
- Utilize an anti-static wrist strap connected to the controller chassis ground point before handling the bare circuit board.
- Inspect guide rails and connector pins for alignment before pushing the board firmly into the backplane slot.
- Verify proper seating of memory cards and internal ribbon cables before initiating controller power-up.
| Quick Quotes | Receive price & availability FAST from our dedicated customer service team. |
|---|---|
| Delivery | Expedited, Freight, And International Shipping Available. |
| Condition | 100% New with Original Package |
| Payment | We accept American Express, Discover, MasterCard, PayPal, and Visa. Our site is secured by RapidSSL. |
| Shipping Port | ShangHai, Xiamen |
| Warranty | 12 Months |
| Q: Is Our Pricing Competitive? |
| A: Yes, we collaborate with over 50 countries worldwide. As a top supplier in China, we offer significant discounts based on market trends. |
| Q: What Is the Warranty Period? |
| A: All our new and original products come with a standard one-year warranty. |
| Q: What Payment Methods Do We Accept? |
| A: We require 100% T/T (Telegraphic Transfer) payment before shipping. For items with a lead time, a 30% deposit is needed upfront, and the remaining 70% is due before shipping. If you have a representative in China, you can arrange an RMB transfer through them. |
| Q: What Shipping Methods Do We Use? |
| A: We primarily use FedEx, DHL, UPS, and BRE for shipping. If you have an account with any of these carriers, you can handle shipping directly. We also offer free shipping to China-based freight forwarders. |
| Q: What Is Our Delivery Time? |
| A: Delivery usually takes 1-3 days after receiving the initial payment. For items with a lead time, shipping will occur according to the specified schedule. |
| Q: How Do We Package the Goods? |
| A: We ensure safe packaging with multiple layers of protection. Products are first placed in their original boxes and sealed with labels. A layer of bubble wrap is then added for collision protection during transit. Finally, the items are packed securely in durable boxes. |
| Q: How Can Customers Contact Us and Request a Quote? |
| A: You can reach out to us via email, WhatsApp, WeChat, Skype, or your preferred communication platform. Contact us with your needs, and we'll provide a prompt, customized quote. |
