ABB RET615E_E Relion 615 Protection Relay
The ABB RET615E_E, also cataloged as the RET615E_E Protection Relay, operates as a dedicated hardware component for transformer differential protection and unit supervision within Relion 615 substation automation networks.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | RET615E_E |
| Brand | ABB |
| Origin | Switzerland |
| Weight | Standard withdrawable module weight |
| Dimensions | Compact panel/rack mounting enclosure |
| Operating Temp | -25 to +55 deg C |
| Power Consumption | Station battery / auxiliary power driven |
| System Platform | ABB Relion 615 Series |
| Communication Protocols | IEC 61850 Ed. 2, Modbus, DNP3, IEC 60870-5-103 |
| Enclosure Style | Withdrawable plug-in unit |
| Protection Functions | Transformer Differential Protection, Overcurrent, Neutral Grounding Supervision |
Backplane Bus Communication & Deterministic Networks
The ABB RET615E_E executes high-speed signal distribution across internal backplane bus channels and station Ethernet networks. Utilizing IEC 61850 Edition 2 and process bus protocol (IEC 61850-9-2 LE) standards, the unit transmits peer-to-peer GOOSE communications and sampled analog values across deterministic substation architectures. Internal firmware flash compatibility supports multi-layer logic schemes programmed via PCM600 software, driving real-time trip circuit decisions without introducing relay backplane communication latencies.
Frequently Asked Questions
Q: How does the withdrawable design feature benefit panel maintenance and relay swapping?
A: The withdrawable plug-in chassis configuration allows technicians to insert or remove the main relay assembly from the panel casing without disturbing existing rear terminal wiring harness connections.
Q: Which communication protocols enable connection to third-party SCADA systems?
A: The module supports native IEC 61850 Edition 2, DNP3, Modbus, and IEC 60870-5-103, as well as Profibus DPV1 when interfaced via an SPA-ZC 302 adapter module.
Q: Can customized protection schemes be loaded onto the RET615E_E?
A: Yes, multi-layer logic functions utilizing internal timers and flip-flops are configured using the signal matrix and graphical logic editor in the PCM600 software toolset.
Field Installation Guidelines
Position the outer casing securely into the panel cutout and verify that the earth grounding strap attaches directly to the main station copper earth bus. Route all current transformer (CT) secondary wiring through dedicated shorting blocks prior to securing connections at the rear terminal block. Ensure process bus and station bus Ethernet cables adhere to industrial shielding standards with proper strain relief. Activate shorting links on current input terminals before removing the withdrawable unit from its housing during routine testing or maintenance.
| Quick Quotes | Receive price & availability FAST from our dedicated customer service team. |
|---|---|
| Delivery | Expedited, Freight, And International Shipping Available. |
| Condition | 100% New with Original Package |
| Payment | We accept American Express, Discover, MasterCard, PayPal, and Visa. Our site is secured by RapidSSL. |
| Shipping Port | ShangHai, Xiamen |
| Warranty | 12 Months |
| Q: Is Our Pricing Competitive? |
| A: Yes, we collaborate with over 50 countries worldwide. As a top supplier in China, we offer significant discounts based on market trends. |
| Q: What Is the Warranty Period? |
| A: All our new and original products come with a standard one-year warranty. |
| Q: What Payment Methods Do We Accept? |
| A: We require 100% T/T (Telegraphic Transfer) payment before shipping. For items with a lead time, a 30% deposit is needed upfront, and the remaining 70% is due before shipping. If you have a representative in China, you can arrange an RMB transfer through them. |
| Q: What Shipping Methods Do We Use? |
| A: We primarily use FedEx, DHL, UPS, and BRE for shipping. If you have an account with any of these carriers, you can handle shipping directly. We also offer free shipping to China-based freight forwarders. |
| Q: What Is Our Delivery Time? |
| A: Delivery usually takes 1-3 days after receiving the initial payment. For items with a lead time, shipping will occur according to the specified schedule. |
| Q: How Do We Package the Goods? |
| A: We ensure safe packaging with multiple layers of protection. Products are first placed in their original boxes and sealed with labels. A layer of bubble wrap is then added for collision protection during transit. Finally, the items are packed securely in durable boxes. |
| Q: How Can Customers Contact Us and Request a Quote? |
| A: You can reach out to us via email, WhatsApp, WeChat, Skype, or your preferred communication platform. Contact us with your needs, and we'll provide a prompt, customized quote. |
