ABB TU839 3BSE046966R1 Extended Module Termination Unit
Configured for field signal termination and sensor power distribution in ABB S800 I/O platforms, the ABB TU839 (TU839 3BSE046966R1 Extended Module Termination Unit) provides direct physical/electrical execution. Supporting up to 8 individually isolated I/O channels rated at 250 V and 1 A per channel, this unit serves as the physical interface for DI820, DI821, and DI825 digital input modules. The termination unit incorporates two individually isolated sensor power distribution groups equipped with 200 mA fuses while distributing ModuleBus power and shifting positional address signals to adjacent MTUs.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | TU839 |
| Brand | ABB |
| Origin | Standard Factory Supply |
| Weight | 0.28 kg |
| Dimensions | 126 mm x 110 mm x 64 mm |
| Operating Temp | 0 to +55 deg C |
| Power Consumption | Passive base structure (Driven by ModuleBus and sensor power inputs) |
| Channel Count | 8 individually isolated channels |
| Rated Voltage | 250 V max |
| Channel Current | 1 A max per channel (10 A max process connection) |
| Sensor Power Groups | 2 individually isolated groups (200 mA fuse per group) |
| Dielectric Test Voltage | 2300 VAC channel-to-ground; 1350 VAC channel-to-channel |
| Compatible Modules | DI820, DI821, DI825 |
| Wire Size Range | 0.2 to 2.5 mm squared / 24 to 14 AWG |
| Terminal Screw Torque | 0.5 Nm |
Backplane Bus Communication Velocity and Mechanical Keying
The TU839 routes deterministic ModuleBus communication lines directly across the S800 I/O backplane, preventing signal degradation between adjacent termination units. Integrated position-shifting circuitry automatically passes positional address signals down the DIN rail, establishing precise physical I/O channel mapping without requiring manual DIP switch configurations. Two mechanical keying wheels offer 36 unique physical combinations to lock out incompatible modules, protecting the 200 mA sensor power circuits and field input channels from improper hardware insertion.
Frequently Asked Questions
Q: What protection level do the two integrated sensor power distribution groups provide?
A: The TU839 contains two individually isolated process power groups, each fitted with a 200 mA fuse. This design limits short-circuit current across external field sensors and prevents a single sensor fault from shutting down the entire 8-channel module base.
Q: How does the ModuleBus addressing shift work when adding additional TU839 units?
A: The internal backplane circuit shifts the incoming position signal by one slot as it passes through the MTU. The outgoing signal informs the next MTU on the DIN rail of its relative position, automating address assignment for the main controller.
Q: Can field wiring remain connected when releasing the TU839 from the DIN rail?
A: Yes. Releasing the bottom spring-loaded mechanical latch via a flathead screwdriver unfastens the unit from the standard 35 mm DIN rail, allowing access without disconnecting individual terminal block conductors.
Field Installation Guidelines
- DIN Rail Alignment: Mount the TU839 onto a standard 35 mm DIN rail (EN 50022). Press firmly until the mechanical latch snaps into place to guarantee physical stability and continuous earth grounding.
- Mechanical Keying Setup: Set the dual 6-position mechanical keying wheels to match the specific configuration requirements of the target digital input module (DI820, DI821, or DI825) prior to module insertion.
- Signal and Power Termination: Strip field conductors to the standard length, insert wires (0.2 to 2.5 mm squared / 24 to 14 AWG) into the screw terminal positions, and tighten terminal screws to a torque of 0.5 Nm.
- Sensor Group Wiring: Connect field sensor power to the dedicated 2-group terminal points, ensuring external current demands stay within the 200 mA rating per fused group.
- Backplane Joining: Align and press adjacent S800 termination units closely together on the DIN rail to establish reliable ModuleBus connector contact and continuous bus communications.
| Quick Quotes | Receive price & availability FAST from our dedicated customer service team. |
|---|---|
| Delivery | Expedited, Freight, And International Shipping Available. |
| Condition | 100% New with Original Package |
| Payment | We accept American Express, Discover, MasterCard, PayPal, and Visa. Our site is secured by RapidSSL. |
| Shipping Port | ShangHai, Xiamen |
| Warranty | 12 Months |
| Q: Is Our Pricing Competitive? |
| A: Yes, we collaborate with over 50 countries worldwide. As a top supplier in China, we offer significant discounts based on market trends. |
| Q: What Is the Warranty Period? |
| A: All our new and original products come with a standard one-year warranty. |
| Q: What Payment Methods Do We Accept? |
| A: We require 100% T/T (Telegraphic Transfer) payment before shipping. For items with a lead time, a 30% deposit is needed upfront, and the remaining 70% is due before shipping. If you have a representative in China, you can arrange an RMB transfer through them. |
| Q: What Shipping Methods Do We Use? |
| A: We primarily use FedEx, DHL, UPS, and BRE for shipping. If you have an account with any of these carriers, you can handle shipping directly. We also offer free shipping to China-based freight forwarders. |
| Q: What Is Our Delivery Time? |
| A: Delivery usually takes 1-3 days after receiving the initial payment. For items with a lead time, shipping will occur according to the specified schedule. |
| Q: How Do We Package the Goods? |
| A: We ensure safe packaging with multiple layers of protection. Products are first placed in their original boxes and sealed with labels. A layer of bubble wrap is then added for collision protection during transit. Finally, the items are packed securely in durable boxes. |
| Q: How Can Customers Contact Us and Request a Quote? |
| A: You can reach out to us via email, WhatsApp, WeChat, Skype, or your preferred communication platform. Contact us with your needs, and we'll provide a prompt, customized quote. |
