GE DS200PTBAG1BBA Mark V Turbine Control Termination Board
The GE DS200PTBAG1BBA, also cataloged as the DS200PTBA Protection Termination Module, operates as a dedicated hardware component for protection signal interfacing and signal routing within GE Mark V Speedtronic Turbine Control platforms.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | DS200PTBAG1BBA |
| Brand | GE |
| Origin | USA |
| Weight | 0.4 kg |
| Dimensions | 21.2 cm x 3.5 cm x 15 cm |
| Operating Temp | 0 deg C to 60 deg C |
| Power Consumption | System Backplane Bus Dependent |
| Module Type | Protection Termination Module |
| Platform Compatibility | GE Mark V Speedtronic System |
| Connectors | 4 Vertical Pin Headers |
| Terminals | 6 Screw-Type Terminals |
Backplane Bus Communication Velocity and Signal Routing
The DS200PTBAG1BBA interfaces directly with the Speedtronic control cores to establish reliable backplane bus communication velocity and signal isolation. Engineers designed the internal trace topology to maintain deterministic low-latency propagation of critical turbine protection signals. By providing channel-to-channel signal routing through dedicated pin headers, the module prevents transient voltage spikes from reaching primary control logic. This architecture ensures high-frequency scan execution and maintains backplane bus integrity across all operating firmware revisions.
Frequently Asked Questions
Q: How do the physical connections support signal integrity across the termination board?
A: The board utilizes four vertical pin headers for ribbon cable connectivity alongside six heavy-duty screw-type terminals, which establish low-resistance physical pathways that prevent signal attenuation during high-vibration operation.
Q: Can engineers hot-swap the DS200PTBAG1BBA while the turbine control system remains powered?
A: Hot-swapping is not permitted; technicians must fully de-energize the local rack segment and discharge field wiring before removing or inserting the module to avoid backplane voltage surges.
Field Installation Guidelines
Technicians must mount the board within standard relay racks using non-conductive standoffs to maintain proper ground isolation. Before attaching field conductors to the six screw-type terminals, installers should verify wire gauge alignment and torque each terminal screw to manufacturer specifications to ensure a vibration-proof connection. Connect all vertical pin headers using original ribbon cables, ensuring proper keying and alignment to prevent bent pins. Installers must route shield wires directly to the designated cabinet earth ground bus with the shortest possible drain wire length, keeping high-voltage power lines strictly separated from sensitive protection signal cabling.
| Quick Quotes | Receive price & availability FAST from our dedicated customer service team. |
|---|---|
| Delivery | Expedited, Freight, And International Shipping Available. |
| Condition | 100% New with Original Package |
| Payment | We accept American Express, Discover, MasterCard, PayPal, and Visa. Our site is secured by RapidSSL. |
| Shipping Port | ShangHai, Xiamen |
| Warranty | 12 Months |
| Q: Is Our Pricing Competitive? |
| A: Yes, we collaborate with over 50 countries worldwide. As a top supplier in China, we offer significant discounts based on market trends. |
| Q: What Is the Warranty Period? |
| A: All our new and original products come with a standard one-year warranty. |
| Q: What Payment Methods Do We Accept? |
| A: We require 100% T/T (Telegraphic Transfer) payment before shipping. For items with a lead time, a 30% deposit is needed upfront, and the remaining 70% is due before shipping. If you have a representative in China, you can arrange an RMB transfer through them. |
| Q: What Shipping Methods Do We Use? |
| A: We primarily use FedEx, DHL, UPS, and BRE for shipping. If you have an account with any of these carriers, you can handle shipping directly. We also offer free shipping to China-based freight forwarders. |
| Q: What Is Our Delivery Time? |
| A: Delivery usually takes 1-3 days after receiving the initial payment. For items with a lead time, shipping will occur according to the specified schedule. |
| Q: How Do We Package the Goods? |
| A: We ensure safe packaging with multiple layers of protection. Products are first placed in their original boxes and sealed with labels. A layer of bubble wrap is then added for collision protection during transit. Finally, the items are packed securely in durable boxes. |
| Q: How Can Customers Contact Us and Request a Quote? |
| A: You can reach out to us via email, WhatsApp, WeChat, Skype, or your preferred communication platform. Contact us with your needs, and we'll provide a prompt, customized quote. |