





Product Overview
The GE DS200TCEAG1BTF is a printed circuit board (PCB) designed for emergency overspeed protection in Mark V turbine control systems. This board plays a crucial role in safeguarding turbines by continuously monitoring rotational speed and triggering emergency shutdowns when overspeed conditions are detected. It ensures the operational safety and system integrity of high-speed rotating machinery, making it essential for protecting valuable assets in power generation systems and industrial machinery.
Technical Specifications
Parameter | Specification |
---|---|
Model | DS200TCEAG1BTF |
Function | Emergency overspeed protection |
Operating Temperature | -40°C to +85°C |
Key Features
-
Emergency Overspeed Protection: Specifically designed to monitor rotational speed and initiate emergency shutdown procedures if an overspeed condition is detected, ensuring protection for critical equipment.
-
Designed for GE Mark V Control Systems: Seamlessly integrates with the GE Mark V turbine control system, making it a vital component for effective turbine monitoring and control.
-
High-Frequency Output: Features 50 kHz output frequency, enabling rapid response to overspeed conditions, crucial for turbine safety.
-
Rugged Industrial Design: Built for the demanding conditions of high-speed rotating machinery and harsh industrial environments, offering durability and reliability.
-
Rack-Mounted Installation: Mounts easily in a standard rack configuration for easy integration and serviceability within control panels.
Application Scenarios
-
Steam and Gas Turbines: Critical for monitoring turbine speed and initiating shutdowns in case of overspeed, ensuring protection of turbines in power generation systems.
-
Power Generation Systems: Provides essential safety functions in power generation plants, ensuring the reliability and protection of turbine operations.
-
Industrial Rotating Machinery: Safeguards a wide range of rotating machinery against overspeed, reducing the risk of equipment damage or failure.
-
Emergency Shutdown Systems: Integral part of emergency shutdown systems for industrial machinery, improving overall plant safety and operational uptime.
FAQ
Q: Is this product brand new and original?
A: Yes, we only supply brand new and original factory items.
Q: Is it in stock?
A: We maintain regular inventory and support urgent orders.
Q: How long is the delivery time?
A: Delivery typically ranges from 3 to 14 days, depending on order size.
Q: What logistics providers do you use?
A: We ship via DHL, FedEx, UPS, TNT, and EMS.
Q: What if there is a quality issue?
A: We offer a 30-day return policy for any quality concerns.
Q: Is DS200TCEAG1BTF compatible with Mark V systems?
A: Yes, this board is specifically designed for GE Mark V turbine control platforms.
Q: Does it support high-speed trip logic?
A: Absolutely, the board provides 50 kHz output for rapid overspeed response and emergency shutdown activation.
Quick Quotes | Receive price & availability FAST from our dedicated customer service team. |
---|---|
Delivery | Expedited, Freight, And International Shipping Available. |
Condition | 100% New with Original Package |
Payment | We accept American Express, Discover, MasterCard, PayPal, and Visa. Our site is secured by RapidSSL. |
Shipping Port | ShangHai, Xiamen |
Warranty | 12 Months |
Q: Is Our Pricing Competitive? |
A: Yes, we collaborate with over 50 countries worldwide. As a top supplier in China, we offer significant discounts based on market trends. |
Q: What Is the Warranty Period? |
A: All our new and original products come with a standard one-year warranty. |
Q: What Payment Methods Do We Accept? |
A: We require 100% T/T (Telegraphic Transfer) payment before shipping. For items with a lead time, a 30% deposit is needed upfront, and the remaining 70% is due before shipping. If you have a representative in China, you can arrange an RMB transfer through them. |
Q: What Shipping Methods Do We Use? |
A: We primarily use FedEx, DHL, UPS, and BRE for shipping. If you have an account with any of these carriers, you can handle shipping directly. We also offer free shipping to China-based freight forwarders. |
Q: What Is Our Delivery Time? |
A: Delivery usually takes 1-3 days after receiving the initial payment. For items with a lead time, shipping will occur according to the specified schedule. |
Q: How Do We Package the Goods? |
A: We ensure safe packaging with multiple layers of protection. Products are first placed in their original boxes and sealed with labels. A layer of bubble wrap is then added for collision protection during transit. Finally, the items are packed securely in durable boxes. |
Q: How Can Customers Contact Us and Request a Quote? |
A: You can reach out to us via email, WhatsApp, WeChat, Skype, or your preferred communication platform. Contact us with your needs, and we'll provide a prompt, customized quote. |