GE DS200DMCBG1AJE DOS DUP Processor Board

GE DS200DMCBG1AJE DOS DUP Processor Board
GE DS200DMCBG1AJE DOS DUP Processor Board
GE DS200DMCBG1AJE DOS DUP Processor Board
GE DS200DMCBG1AJE DOS DUP Processor Board

GE DS200DMCBG1AJE DOS DUP Processor Board

This DS200DMCBG1AJE DOS DUP Processor Board was manufactured by GE FANUC, In Stock, 100% Guaranteed Brand New and Authentic. Link to More Information

 
Manufacturer:
GE FANUC
Part Number:
DS200DMCBG1AJE
Product type:
Country of Origin:
USA
Condition:
New With Original Package
Shipping Port:
ShangHai, Xiamen
Warranty:
12 Months
Collections:
 

Configured for processing and turbine logic execution in Mark V systems, the GE DS200DMCBG1AJE (DS200DMCBG1AJE Processor Board) provides direct physical and electrical execution of turbine control routines via the onboard DUP architecture.

Suffix Breakdown & Model Matrix

  • DS200: Designates the Mark V control system hardware assembly.
  • DMCB: Specifies the DOS DUP (Distributed User Processor) board function.
  • G1: Indicates the hardware generation or revision level.
  • AJE: Defines the specific configuration and iteration of the processor assembly logic.

Hardware Specifications

Parameter Specification
Model DS200DMCBG1AJE
Brand General Electric
Origin USA
Weight 1.0 kg
Dimensions Standard Mark V PCB profile
Operating Temp 0 deg C to 60 deg C
Power Consumption Determined by system backplane load
Connectors 3 x 26-pin, 1 x 40-pin
Jumpers 19 onboard configurations
Diagnostics 2 status LEDs (CR2, CR12)

PLC and Controller Communication

The GE DS200DMCBG1AJE integrates into the Mark V control rack to execute deterministic logic. It requires precise backplane bus communication velocity to maintain synchronization with the main controller and associated I/O modules. Firmware flash compatibility is strictly dependent on the overall Mark V rack software revision; users must verify the compatibility of the processor logic with existing system firmware before installation. The board utilizes onboard components—including rectifiers, diodes, and capacitors—to regulate voltage levels across the processor circuit, ensuring stability during high-speed computational cycles.

Frequently Asked Questions (FAQ)

Q: Can the onboard jumpers be modified while the system is energized?

A: No. Modifying jumper configurations while the module is under power can cause immediate processing errors or permanent damage to the logic circuitry. Perform all hardware configuration changes with the power isolated.

Q: What do the CR2 and CR12 LED indicators signify?

A: These LEDs provide real-time status of processing activity. Typically, a steady state indicates active communication and internal clock synchronization, while irregular flashing may signify a processor fault or communication failure.

Field Installation Guidelines

  1. Preparation: Isolate the Mark V rack from all external power sources before handling the module.
  2. ESD Protection: Use a grounded wrist strap to prevent electrostatic discharge, which can damage the sensitive integrated circuits on the board.
  3. Mounting: Insert the DS200DMCBG1AJE into the designated rack slot, ensuring the board aligns with the internal guide rails. Press firmly until the backplane connectors seat completely.
  4. Interface Connection: Attach the 26-pin and 40-pin cables. Ensure the locking mechanisms are secure to prevent intermittent signal failures caused by rack-induced vibrations.
  5. Configuration Verification: Before startup, verify that the 19 onboard jumpers are set according to the specific turbine control application requirements specified in the system documentation.
  6. Startup: Energize the rack and observe the status LEDs for nominal operating patterns during the self-test sequence.
Quick Quotes Receive price & availability FAST from our dedicated customer service team.
Delivery Expedited, Freight, And International Shipping Available.
Condition 100% New with Original Package
Payment We accept American Express, Discover, MasterCard, PayPal, and Visa. Our site is secured by RapidSSL.
Shipping Port ShangHai, Xiamen
Warranty 12 Months
Q: Is Our Pricing Competitive?
A: Yes, we collaborate with over 50 countries worldwide. As a top supplier in China, we offer significant discounts based on market trends.
Q: What Is the Warranty Period?
A: All our new and original products come with a standard one-year warranty.
Q: What Payment Methods Do We Accept?
A: We require 100% T/T (Telegraphic Transfer) payment before shipping. For items with a lead time, a 30% deposit is needed upfront, and the remaining 70% is due before shipping. If you have a representative in China, you can arrange an RMB transfer through them.
Q: What Shipping Methods Do We Use?
A: We primarily use FedEx, DHL, UPS, and BRE for shipping. If you have an account with any of these carriers, you can handle shipping directly. We also offer free shipping to China-based freight forwarders.
Q: What Is Our Delivery Time?
A: Delivery usually takes 1-3 days after receiving the initial payment. For items with a lead time, shipping will occur according to the specified schedule.
Q: How Do We Package the Goods?
A: We ensure safe packaging with multiple layers of protection. Products are first placed in their original boxes and sealed with labels. A layer of bubble wrap is then added for collision protection during transit. Finally, the items are packed securely in durable boxes.
Q: How Can Customers Contact Us and Request a Quote?
A: You can reach out to us via email, WhatsApp, WeChat, Skype, or your preferred communication platform. Contact us with your needs, and we'll provide a prompt, customized quote.
 

Recently Viewed

Express Shipping icon
Express Shipping
Rapid delivery for your urgent requirements.
Large stock icon
Extensive Inventory
Large stock for immediate dispatch.
Quality Assurance Icon
Quality Assurance
Authentic, top-grade PLC & DCS components.
Global Service icon
Global Service
Supporting clients worldwide with dependable service.