GE DS200TBCAG1AAA Mark V Analog I/O Terminal Board
The GE DS200TBCAG1AAA, also cataloged as the DS200TBCA Analog I/O Terminal Board, operates as a dedicated hardware component for analog signal termination and conditioning within GE Mark V Speedtronic platforms.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | DS200TBCAG1AAA |
| Brand | GE |
| Origin | USA |
| Weight | 0.6 kg |
| Dimensions | 200 mm x 120 mm x 50 mm |
| Operating Temp | -30 deg C to +70 deg C |
| Power Consumption | Backplane Dependent |
| Module Type | Analog I/O Terminal Board |
| Connectors | Dual 50-pin Connectors (JDD and JCC) |
| Signal Terminals | 180 Terminals |
Backplane Bus Communication Velocity and Signal Routing
The DS200TBCAG1AAA processes analog sensor inputs, including Resistance Temperature Detectors (RTDs) and thermocouples, while managing direct signal routing to the Mark V control cores. Internal trace routing optimizes backplane bus communication velocity and limits high-frequency noise propagation across analog channels. Through dedicated dual 50-pin JDD and JCC connectors, the board maintains high channel density scaling and ensures firmware flash compatibility across legacy and current Speedtronic rack revisions.
Frequently Asked Questions
Q: How do installers interface field sensors to the board to prevent noise interference?
A: Field technicians must terminate analog cables directly at the 180 dedicated screw terminals while maintaining low-impedance ground connections at the cabinet earth rail to preserve signal accuracy.
Q: Can technicians swap the DS200TBCAG1AAA terminal board without shutting down the control rack?
A: Technicians must fully de-energize the host control core and disconnect all 50-pin ribbon connectors before replacing the board to prevent backplane bus communication faults and electrical arc hazards.
Q: How do the JDD and JCC connectors interface with the Speedtronic core architecture?
A: The dual 50-pin JDD and JCC connectors route multi-channel analog inputs directly to the internal bus, maintaining pin-to-pin alignment and firmware compatibility across backward hardware revisions.
Field Installation Guidelines
Installers must mount the DS200TBCAG1AAA inside standard relay rack enclosures using ground-isolated hardware standoffs. Connect field wiring to the 180 signal terminals using calibrated hand tools, verifying that terminal screws are properly torqued to avoid loose contacts during continuous operation. Ensure that dual 50-pin JDD and JCC ribbon cables engage securely into their corresponding headers without twisting or bending internal pins. Route all RTD and thermocouple shield drains to a centralized earthing bar using the shortest practical wire run, keeping low-level analog wiring physically segregated from high-voltage AC power distribution conduits.
| Quick Quotes | Receive price & availability FAST from our dedicated customer service team. |
|---|---|
| Delivery | Expedited, Freight, And International Shipping Available. |
| Condition | 100% New with Original Package |
| Payment | We accept American Express, Discover, MasterCard, PayPal, and Visa. Our site is secured by RapidSSL. |
| Shipping Port | ShangHai, Xiamen |
| Warranty | 12 Months |
| Q: Is Our Pricing Competitive? |
| A: Yes, we collaborate with over 50 countries worldwide. As a top supplier in China, we offer significant discounts based on market trends. |
| Q: What Is the Warranty Period? |
| A: All our new and original products come with a standard one-year warranty. |
| Q: What Payment Methods Do We Accept? |
| A: We require 100% T/T (Telegraphic Transfer) payment before shipping. For items with a lead time, a 30% deposit is needed upfront, and the remaining 70% is due before shipping. If you have a representative in China, you can arrange an RMB transfer through them. |
| Q: What Shipping Methods Do We Use? |
| A: We primarily use FedEx, DHL, UPS, and BRE for shipping. If you have an account with any of these carriers, you can handle shipping directly. We also offer free shipping to China-based freight forwarders. |
| Q: What Is Our Delivery Time? |
| A: Delivery usually takes 1-3 days after receiving the initial payment. For items with a lead time, shipping will occur according to the specified schedule. |
| Q: How Do We Package the Goods? |
| A: We ensure safe packaging with multiple layers of protection. Products are first placed in their original boxes and sealed with labels. A layer of bubble wrap is then added for collision protection during transit. Finally, the items are packed securely in durable boxes. |
| Q: How Can Customers Contact Us and Request a Quote? |
| A: You can reach out to us via email, WhatsApp, WeChat, Skype, or your preferred communication platform. Contact us with your needs, and we'll provide a prompt, customized quote. |
