GE DS3820PSCB 1C1B Power Supply Assembly Module

GE DS3820PSCB 1C1B Power Supply Assembly Module
GE DS3820PSCB 1C1B Power Supply Assembly Module
GE DS3820PSCB 1C1B Power Supply Assembly Module
GE DS3820PSCB 1C1B Power Supply Assembly Module
GE DS3820PSCB 1C1B Power Supply Assembly Module
GE DS3820PSCB 1C1B Power Supply Assembly Module

GE DS3820PSCB 1C1B Power Supply Assembly Module

This DS3820PSCB 1C1B Power Supply Assembly Module was manufactured by GE FANUC, In Stock, 100% Guaranteed Brand New and Authentic. Link to More Information

 
Manufacturer:
GE FANUC
Part Number:
DS3820PSCB 1C1B
Country of Origin:
USA
Condition:
New With Original Package
Shipping Port:
ShangHai, Xiamen
Warranty:
12 Months
Collections:
 

The GE DS3820PSCB 1C1B, also cataloged as the DS3820PSCB Power Supply Assembly Module, operates as a dedicated hardware component for power distribution within Mark IV Speedtronic Gas Turbine Control Systems. The module facilitates the conversion of high-voltage DC input into regulated secondary voltages required for control logic and relay actuation.

Hardware Specifications

Parameter Specification
Model DS3820PSCB 1C1B
Brand General Electric
Origin United States
Weight 2.5 kg
Dimensions 15.9 cm x 19.7 cm
Operating Temp -40 to +65 deg C
Power Consumption 60 W
Input Voltage 80-140 VDC
Output Voltages +5 VDC, +15 VDC, -15 VDC
Relay Channels 16

Firmware Flash Compatibility and Bus Integration

The DS3820PSCB 1C1B integrates into the Mark IV architecture to manage internal backplane bus communication velocity requirements. Its power conversion circuitry is calibrated to maintain stable DC output rails during transient load conditions typical of turbine control environments. The module firmware and hardware configuration support standardized interfacing with existing Mark IV racks, ensuring that I/O density scaling remains within the thermal dissipation profiles of the original enclosure. Signal integrity is maintained through isolated power planes, preventing ripple current feedback into the primary control logic circuits.

Frequently Asked Questions

Q: Does the DS3820PSCB 1C1B support hot-swap functionality during turbine operation?

A: No, this module is not designed for hot-swap. The input power must be isolated and the backplane de-energized before physical removal to prevent electrical arcing or damage to the backplane connectors.

Q: How should the output voltages be verified after installation?

A: Use a calibrated multimeter to measure the +5 VDC, +15 VDC, and -15 VDC test points relative to common ground. Ensure all readings are within manufacturer-specified tolerance ranges before enabling the relay channels.

Field Installation Guidelines

  1. Ensure all primary power input (80-140 VDC) is disconnected and locked out prior to handling the module.
  2. Inspect the rear backplane connectors for pin alignment and oxidation; ensure the mating surface is clean.
  3. Slide the module into the designated slot within the Mark IV rack, ensuring the module guides are properly aligned to prevent damage to the backplane bus.
  4. Tighten the front-panel retaining screws to ensure proper grounding and mechanical stability against vibration.
  5. Verify that the ambient rack temperature does not exceed the operating limit of 65 deg C to prevent thermal degradation of internal components.
  6. Connect all requisite signal leads, ensuring that cable shields are grounded at the designated common point to minimize electromagnetic interference.
Quick Quotes Receive price & availability FAST from our dedicated customer service team.
Delivery Expedited, Freight, And International Shipping Available.
Condition 100% New with Original Package
Payment We accept American Express, Discover, MasterCard, PayPal, and Visa. Our site is secured by RapidSSL.
Shipping Port ShangHai, Xiamen
Warranty 12 Months
Q: Is Our Pricing Competitive?
A: Yes, we collaborate with over 50 countries worldwide. As a top supplier in China, we offer significant discounts based on market trends.
Q: What Is the Warranty Period?
A: All our new and original products come with a standard one-year warranty.
Q: What Payment Methods Do We Accept?
A: We require 100% T/T (Telegraphic Transfer) payment before shipping. For items with a lead time, a 30% deposit is needed upfront, and the remaining 70% is due before shipping. If you have a representative in China, you can arrange an RMB transfer through them.
Q: What Shipping Methods Do We Use?
A: We primarily use FedEx, DHL, UPS, and BRE for shipping. If you have an account with any of these carriers, you can handle shipping directly. We also offer free shipping to China-based freight forwarders.
Q: What Is Our Delivery Time?
A: Delivery usually takes 1-3 days after receiving the initial payment. For items with a lead time, shipping will occur according to the specified schedule.
Q: How Do We Package the Goods?
A: We ensure safe packaging with multiple layers of protection. Products are first placed in their original boxes and sealed with labels. A layer of bubble wrap is then added for collision protection during transit. Finally, the items are packed securely in durable boxes.
Q: How Can Customers Contact Us and Request a Quote?
A: You can reach out to us via email, WhatsApp, WeChat, Skype, or your preferred communication platform. Contact us with your needs, and we'll provide a prompt, customized quote.
 

Recently Viewed

Express Shipping icon
Express Shipping
Rapid delivery for your urgent requirements.
Large stock icon
Extensive Inventory
Large stock for immediate dispatch.
Quality Assurance Icon
Quality Assurance
Authentic, top-grade PLC & DCS components.
Global Service icon
Global Service
Supporting clients worldwide with dependable service.