The GE IS200JPDFG1A, also cataloged as the IS200JPDFG1 Power Distribution Board, operates as a dedicated hardware component for localized power routing and voltage regulation within Mark VI control system racks.
Suffix Breakdown & Model Matrix
- IS200: Printed circuit board assembly (Mark VI series).
- JPDF: Functional identifier for the JPDF-type Power Distribution board architecture.
- G1: Hardware revision level indicating the baseline design tier.
- A: Primary manufacturing variant.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | IS200JPDFG1A |
| Brand | General Electric |
| Origin | USA |
| Weight | 0.3 kg |
| Dimensions | 2.5 cm x 10.8 cm x 12.7 cm |
| Operating Temp | -20 deg C to +60 deg C |
| Power Consumption | Backplane dependent |
| Mounting | Chassis-mount terminal board |
Firmware Flash Compatibility and Bus Communication
The IS200JPDFG1A serves as a critical junction for distributing DC power rails throughout the control cabinet. As a passive-active hybrid distribution board, it ensures that voltage levels remain within tolerance for downstream I/O packs and processor modules. The module maintains full firmware flash compatibility with all Mark VI rack configurations, as it does not require dedicated logic processing. Instead, it provides essential diagnostic voltage feedback to the controller, ensuring that any deviation in supply voltage is captured and reported via the system's diagnostic registers.
Frequently Asked Questions
Q: Does the IS200JPDFG1A require configuration via ControlST software?
A: No. As a power distribution component, it is a hardware-transparent module. Configuration is limited to the physical wiring of input and output power loops.
Q: Is this board susceptible to surges if the primary power supply fails?
A: The board includes onboard filtering to mitigate minor transients; however, it relies on the primary system protection and upstream UPS or power conditioning units to prevent severe surge-related damage.
Field Installation Guidelines
- Safety Isolation: Ensure the Mark VI cabinet rack is de-energized and verified with a voltmeter before proceeding with installation.
- Mounting: Secure the IS200JPDFG1A board to the designated chassis location using the provided mounting standoffs. Ensure the board is properly grounded to the cabinet frame.
- Wiring: Connect primary DC power inputs to the board’s designated terminals. Maintain correct polarity to prevent reverse-voltage damage to the distribution circuitry.
- Validation: Before energizing, verify all connections against the system-specific wiring diagrams. Use a multimeter to confirm no short-circuits exist between power rails and ground.
- System Check: Once energized, monitor the ControlST diagnostic suite to ensure that all downstream modules are receiving correct voltage and that no power-related fault flags are active.
| Quick Quotes | Receive price & availability FAST from our dedicated customer service team. |
|---|---|
| Delivery | Expedited, Freight, And International Shipping Available. |
| Condition | 100% New with Original Package |
| Payment | We accept American Express, Discover, MasterCard, PayPal, and Visa. Our site is secured by RapidSSL. |
| Shipping Port | ShangHai, Xiamen |
| Warranty | 12 Months |
| Q: Is Our Pricing Competitive? |
| A: Yes, we collaborate with over 50 countries worldwide. As a top supplier in China, we offer significant discounts based on market trends. |
| Q: What Is the Warranty Period? |
| A: All our new and original products come with a standard one-year warranty. |
| Q: What Payment Methods Do We Accept? |
| A: We require 100% T/T (Telegraphic Transfer) payment before shipping. For items with a lead time, a 30% deposit is needed upfront, and the remaining 70% is due before shipping. If you have a representative in China, you can arrange an RMB transfer through them. |
| Q: What Shipping Methods Do We Use? |
| A: We primarily use FedEx, DHL, UPS, and BRE for shipping. If you have an account with any of these carriers, you can handle shipping directly. We also offer free shipping to China-based freight forwarders. |
| Q: What Is Our Delivery Time? |
| A: Delivery usually takes 1-3 days after receiving the initial payment. For items with a lead time, shipping will occur according to the specified schedule. |
| Q: How Do We Package the Goods? |
| A: We ensure safe packaging with multiple layers of protection. Products are first placed in their original boxes and sealed with labels. A layer of bubble wrap is then added for collision protection during transit. Finally, the items are packed securely in durable boxes. |
| Q: How Can Customers Contact Us and Request a Quote? |
| A: You can reach out to us via email, WhatsApp, WeChat, Skype, or your preferred communication platform. Contact us with your needs, and we'll provide a prompt, customized quote. |
