IS200TVIBH2B General Electric Vibration Term Board

IS200TVIBH2B General Electric Vibration Term Board
IS200TVIBH2B General Electric Vibration Term Board
IS200TVIBH2B General Electric Vibration Term Board
IS200TVIBH2B General Electric Vibration Term Board
IS200TVIBH2B General Electric Vibration Term Board
IS200TVIBH2B General Electric Vibration Term Board

IS200TVIBH2B General Electric Vibration Term Board

This IS200TVIBH2B Vibration Term Board was manufactured by GE FANUC, In Stock, 100% Guaranteed Brand New and Authentic. Link to More Information

 
Manufacturer:
GE FANUC
Part Number:
IS200TVIBH2B
Product type:
Country of Origin:
USA
Condition:
New With Original Package
Shipping Port:
ShangHai, Xiamen
Warranty:
12 Months
Collections:
 

Configured for high-speed signal conditioning and vibration sensor interface in Mark VIe control systems, the General Electric IS200TVIBH2B (IS200TVIBH2 Vibration Term Board) provides direct physical and electrical terminal mapping for rotating machinery instrumentation.

Hardware Specifications

Parameter Specification
Model IS200TVIBH2B
Brand General Electric
Origin USA
Weight 0.25 kg
Dimensions 138 mm x 25.4 mm x 120 mm
Operating Temp -20 deg C to 60 deg C
Power Consumption 2 W (Passive Termination)
Mounting Type DIN-rail / Cabinet standoff

Rotor Dynamics and Signal Scaling

The IS200TVIBH2B serves as the primary interface for processing raw sensor data required for rotor dynamics analysis. This board facilitates the routing of transducer signals, including support for eddy-current probe scaling, allowing the monitoring system to establish precise gap voltage references. Maintaining target gap voltages, typically centered at -10 VDC, is necessary to ensure signal linearity and accurate vibration amplitude measurement. The board is designed to provide robust cross-talk suppression by isolating input channels on the terminal block, which prevents electromagnetic interference from manifesting as artificial vibration harmonics in the monitoring software.

Frequently Asked Questions

Q: Does the IS200TVIBH2B require specific grounding practices for vibration sensors?

A: Yes. To maintain signal integrity, the cable shields must be terminated at the designated shield ground points on the board. Ensure that the total loop impedance does not exceed the specified threshold for the connected monitoring module.

Q: Is this board compatible with different types of proximity probe power configurations?

A: The board functions as a termination point; it routes the -24 VDC supply provided by the rack I/O module to the probes. Verify that the power supply voltage at the probe tip remains within the operational range after accounting for cable voltage drop.

Field Installation Guidelines

  • Verify that the terminal board is firmly seated in the cabinet and all mounting screws are torqued to prevent vibration-induced loosening.
  • Ensure all field wiring is labeled according to the loop diagram before insertion into the screw terminals.
  • Maintain proper segregation between high-voltage field wiring and low-voltage vibration signal cables to prevent inductive coupling.
  • Use shielded twisted-pair cabling for all sensor inputs and connect the shield to the terminal board ground point only at the signal source end or as specified by the system design documentation to avoid ground loops.
  • Conduct a point-to-point electrical continuity test after installation to ensure no short circuits exist between the signal lines and the cabinet chassis.
Quick Quotes Receive price & availability FAST from our dedicated customer service team.
Delivery Expedited, Freight, And International Shipping Available.
Condition 100% New with Original Package
Payment We accept American Express, Discover, MasterCard, PayPal, and Visa. Our site is secured by RapidSSL.
Shipping Port ShangHai, Xiamen
Warranty 12 Months
Q: Is Our Pricing Competitive?
A: Yes, we collaborate with over 50 countries worldwide. As a top supplier in China, we offer significant discounts based on market trends.
Q: What Is the Warranty Period?
A: All our new and original products come with a standard one-year warranty.
Q: What Payment Methods Do We Accept?
A: We require 100% T/T (Telegraphic Transfer) payment before shipping. For items with a lead time, a 30% deposit is needed upfront, and the remaining 70% is due before shipping. If you have a representative in China, you can arrange an RMB transfer through them.
Q: What Shipping Methods Do We Use?
A: We primarily use FedEx, DHL, UPS, and BRE for shipping. If you have an account with any of these carriers, you can handle shipping directly. We also offer free shipping to China-based freight forwarders.
Q: What Is Our Delivery Time?
A: Delivery usually takes 1-3 days after receiving the initial payment. For items with a lead time, shipping will occur according to the specified schedule.
Q: How Do We Package the Goods?
A: We ensure safe packaging with multiple layers of protection. Products are first placed in their original boxes and sealed with labels. A layer of bubble wrap is then added for collision protection during transit. Finally, the items are packed securely in durable boxes.
Q: How Can Customers Contact Us and Request a Quote?
A: You can reach out to us via email, WhatsApp, WeChat, Skype, or your preferred communication platform. Contact us with your needs, and we'll provide a prompt, customized quote.
 

Recently Viewed

Express Shipping icon
Express Shipping
Rapid delivery for your urgent requirements.
Large stock icon
Extensive Inventory
Large stock for immediate dispatch.
Quality Assurance Icon
Quality Assurance
Authentic, top-grade PLC & DCS components.
Global Service icon
Global Service
Supporting clients worldwide with dependable service.