The GE DS3820PSCC1D1B, also cataloged as the DS3820PSCC1D1B Power Supply Unit, operates as a dedicated hardware component for power distribution within Mark IV turbine control systems.
Suffix Breakdown & Model Matrix
The DS3820PSCC1D1B is defined by its specific electrical output configuration within the Mark IV product line. The "C1" indicates the primary power conversion architecture, while the "D1B" suffix denotes the specific board revision and assembly iteration, which dictates the physical footprint and terminal connectivity standards for the Mark IV cabinet housing.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | DS3820PSCC1D1B |
| Brand | GE |
| Origin | USA |
| Weight | 5.56 kg |
| Dimensions | 19.5 cm x 28.5 cm x 29 cm |
| Operating Temp | -30 to 65 deg C |
| Power Consumption | Not specified |
| Output Voltage | +28.00 VDC |
| Output Current | 6.0 A |
Pepperl+Fuchs / Phoenix Contact: Surge voltage protection limits
The unit integrates surge voltage protection limits designed to suppress transient spikes from the primary power source, ensuring the stability of the +28.00 VDC output. This protection circuitry is maintained within the power stage to prevent damage to sensitive downstream logic controllers. The thermal heat sink dissipation profile is calculated to handle the 6.0 A load across the specified temperature range, ensuring that internal components remain below critical failure thresholds during peak operational demand.
Frequently Asked Questions (FAQ)
Q: What is the procedure for verifying the +28.00 VDC output? A: Verification should be performed at the designated output terminals using a calibrated digital multimeter. Ensure the load is within the 6.0 A limit before measuring to avoid voltage droop caused by excessive current draw.
Q: Is this power supply compatible with other turbine control series? A: No. The DS3820PSCC1D1B is explicitly engineered for the Mark IV architecture. It must not be interchanged with power supplies from the Mark V or later systems, as the pinout, output impedance, and regulation characteristics are specific to the Mark IV design.
Field Installation Guidelines
- Confirm that the main AC input source is de-energized and locked out (LOTO) before connecting the power supply.
- Ensure adequate airflow around the unit, maintaining the required clearance specified for heat dissipation within the cabinet.
- Secure the module to the panel mount using the provided mounting hardware, ensuring a solid chassis-to-cabinet bond for effective EMI shielding.
- Verify all output connections are tightened to the specified torque to prevent resistive heating at the terminal blocks.
- Check that the input voltage matches the rating for the specific unit version before applying power to the primary input terminals.
| Quick Quotes | Receive price & availability FAST from our dedicated customer service team. |
|---|---|
| Delivery | Expedited, Freight, And International Shipping Available. |
| Condition | 100% New with Original Package |
| Payment | We accept American Express, Discover, MasterCard, PayPal, and Visa. Our site is secured by RapidSSL. |
| Shipping Port | ShangHai, Xiamen |
| Warranty | 12 Months |
| Q: Is Our Pricing Competitive? |
| A: Yes, we collaborate with over 50 countries worldwide. As a top supplier in China, we offer significant discounts based on market trends. |
| Q: What Is the Warranty Period? |
| A: All our new and original products come with a standard one-year warranty. |
| Q: What Payment Methods Do We Accept? |
| A: We require 100% T/T (Telegraphic Transfer) payment before shipping. For items with a lead time, a 30% deposit is needed upfront, and the remaining 70% is due before shipping. If you have a representative in China, you can arrange an RMB transfer through them. |
| Q: What Shipping Methods Do We Use? |
| A: We primarily use FedEx, DHL, UPS, and BRE for shipping. If you have an account with any of these carriers, you can handle shipping directly. We also offer free shipping to China-based freight forwarders. |
| Q: What Is Our Delivery Time? |
| A: Delivery usually takes 1-3 days after receiving the initial payment. For items with a lead time, shipping will occur according to the specified schedule. |
| Q: How Do We Package the Goods? |
| A: We ensure safe packaging with multiple layers of protection. Products are first placed in their original boxes and sealed with labels. A layer of bubble wrap is then added for collision protection during transit. Finally, the items are packed securely in durable boxes. |
| Q: How Can Customers Contact Us and Request a Quote? |
| A: You can reach out to us via email, WhatsApp, WeChat, Skype, or your preferred communication platform. Contact us with your needs, and we'll provide a prompt, customized quote. |
