ProSoft MVI56-GEC ControlLogix Ethernet Communication Module
Configured for generic ASCII protocol data frame handling over TCP/IP networks in Rockwell Automation ControlLogix systems, the ProSoft MVI56-GEC (MVI56-GEC Ethernet Communication Module) provides direct physical/electrical execution. The module interfaces directly with the backplane logic host to map ASCII string telemetry into native processor data structures. By maintaining hardware-level buffer isolation, the single-slot unit offloads string processing, socket management, and network packet framing from the main host controller.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | MVI56-GEC |
| Brand | ProSoft |
| Origin | USA |
| Weight | 1.8 kg |
| Dimensions | 2 x 19 x 12.9 cm |
| Operating Temp | -40 to +70 deg C |
| Power Consumption | Backplane Current Load: 800 mA at 5 VDC, 3 mA at 24 VDC |
| Module Type | Generic ASCII Ethernet Interface Module |
| Mounting Slot | Single-slot ControlLogix local or remote chassis |
| Concurrent Sockets | Up to 5 TCP client connections and 5 TCP server connections |
| IP Configuration | Static IP or DHCP client addressing |
| Protocol Support | ASCII over TCP/IP networks |
Protocol Conversion Latencies & Bus Synchronization
The module maintains low protocol conversion latencies when translating raw ASCII packet streams into 16-bit integer array structures across the ControlLogix backplane. Internal buffer management splits transmission handling and incoming character assembly into dedicated hardware register spaces. Furthermore, deterministic backplane bus communication velocity allows large data blocks to cycle between the local module memory and the host processor tag database without interrupting primary controller execution loops.
Frequently Asked Questions
Q: How does the backplane interface manage simultaneous client and server socket execution?
A: The internal firmware divides socket processing into distinct threading queues, executing up to 5 concurrent client connections and 5 concurrent server connections while buffering up to 2 KB of ASCII string data per socket prior to backplane transfer cycles.
Q: Can the module operate in a remote ControlLogix rack connected via EtherNet/IP adapters?
A: Yes, the unit functions in either local controller racks or remote I/O chassis, provided the backplane assembly supports standard ControlLogix scheduled I/O data connection rates.
Field Installation Guidelines
Engineers must observe strict static control and wiring rules during hardware installation:
- Turn off backplane system power before inserting or seating the module into the ControlLogix rack. Align the module circuit board with the chassis guide rails and push firmly until the top and bottom retention latches snap securely into place.
- Route industrial-grade shielded twisted-pair (STP) Ethernet cabling away from high-voltage motor conductors or AC power feeds to minimize electromagnetic interference.
- Ensure the Ethernet shield terminates directly to the structural panel ground at one end, maintaining continuous equipotential bonding across the enclosure grounding bar.
- Verify mechanical wire strain relief near the RJ45 port to prevent physical force from stressing the internal socket connectors during high-vibration operational cycles.
| Quick Quotes | Receive price & availability FAST from our dedicated customer service team. |
|---|---|
| Delivery | Expedited, Freight, And International Shipping Available. |
| Condition | 100% New with Original Package |
| Payment | We accept American Express, Discover, MasterCard, PayPal, and Visa. Our site is secured by RapidSSL. |
| Shipping Port | ShangHai, Xiamen |
| Warranty | 12 Months |
| Q: Is Our Pricing Competitive? |
| A: Yes, we collaborate with over 50 countries worldwide. As a top supplier in China, we offer significant discounts based on market trends. |
| Q: What Is the Warranty Period? |
| A: All our new and original products come with a standard one-year warranty. |
| Q: What Payment Methods Do We Accept? |
| A: We require 100% T/T (Telegraphic Transfer) payment before shipping. For items with a lead time, a 30% deposit is needed upfront, and the remaining 70% is due before shipping. If you have a representative in China, you can arrange an RMB transfer through them. |
| Q: What Shipping Methods Do We Use? |
| A: We primarily use FedEx, DHL, UPS, and BRE for shipping. If you have an account with any of these carriers, you can handle shipping directly. We also offer free shipping to China-based freight forwarders. |
| Q: What Is Our Delivery Time? |
| A: Delivery usually takes 1-3 days after receiving the initial payment. For items with a lead time, shipping will occur according to the specified schedule. |
| Q: How Do We Package the Goods? |
| A: We ensure safe packaging with multiple layers of protection. Products are first placed in their original boxes and sealed with labels. A layer of bubble wrap is then added for collision protection during transit. Finally, the items are packed securely in durable boxes. |
| Q: How Can Customers Contact Us and Request a Quote? |
| A: You can reach out to us via email, WhatsApp, WeChat, Skype, or your preferred communication platform. Contact us with your needs, and we'll provide a prompt, customized quote. |
