The GE DS200DDTBG2A, also cataloged as the DS200DDTBG2A LCI Auxiliary I/O Terminal Board, operates as a dedicated hardware component for signal conditioning and isolation within the LS2100 Static Starter Control System. The board executes high-density data transition between the ADMA analog-to-digital module and external peripheral instrumentation.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | DS200DDTBG2A |
| Brand | GE |
| Origin | USA |
| Weight | 0.5 kg |
| Dimensions | Standard LS2100 footprint |
| Operating Temp | -20 deg C to +60 deg C |
| Power Consumption | 28 VDC (Nominal) |
| I/O Capacity | 12 Channels (Mixed Analog/Digital) |
| Relay Output | 2 Form-C (20 A at 240 VAC / 10 A at 30 VDC) |
| Connectors | 60-pin high-density ribbon header / 36-position double-row |
Backplane Bus and Firmware Compatibility
The GE DS200DDTBG2A utilizes high-density ribbon connectors to maintain communication throughput across the LS2100 backplane architecture. To ensure deterministic network performance, the firmware compatibility must be verified against the host ADMA module revision. The board facilitates internal signal path synchronization, requiring specific backplane bus communication velocity settings to prevent latency in static starter activation sequences. Firmware flash procedures must be executed via the designated control rack interface to avoid I/O mapping inconsistencies or signal processing timeouts.
Frequently Asked Questions
Q: Are the Form-C relay outputs on the DS200DDTBG2A hot-swappable during system operation?
A: No. Due to the potential for electrical arcing and signal disruption to the LS2100 control loops, the system must be de-energized before removing or replacing the board.
Q: How should the high-density ribbon cables be secured to prevent signal attenuation?
A: Ribbon headers must be fully seated with locking clips engaged. Ensure the cable path is routed away from high-voltage AC lines to minimize electromagnetic interference on the analog signal channels.
Field Installation Guidelines
- Power Disconnection: Verify that the 28 VDC power source is isolated and locked out prior to handling the board to prevent accidental component damage.
- Mounting: Secure the board onto the designated panel or rack standoffs using the provided mounting holes. Ensure consistent contact with the chassis ground plane to minimize noise.
- Cabling: Connect the 60-pin ribbon cable to header TBPL first, ensuring proper pin orientation. Connect external I/O wires to terminal strips TB1 through TB5, adhering to the torque specifications for standard terminal screws.
- Shielding: All shielded cables should have their drain wires terminated to the system earth ground at a single common point to eliminate ground loops.
- Verification: Inspect all LED status indicators upon re-energizing the system to confirm correct relay state and power delivery.
| Quick Quotes | Receive price & availability FAST from our dedicated customer service team. |
|---|---|
| Delivery | Expedited, Freight, And International Shipping Available. |
| Condition | 100% New with Original Package |
| Payment | We accept American Express, Discover, MasterCard, PayPal, and Visa. Our site is secured by RapidSSL. |
| Shipping Port | ShangHai, Xiamen |
| Warranty | 12 Months |
| Q: Is Our Pricing Competitive? |
| A: Yes, we collaborate with over 50 countries worldwide. As a top supplier in China, we offer significant discounts based on market trends. |
| Q: What Is the Warranty Period? |
| A: All our new and original products come with a standard one-year warranty. |
| Q: What Payment Methods Do We Accept? |
| A: We require 100% T/T (Telegraphic Transfer) payment before shipping. For items with a lead time, a 30% deposit is needed upfront, and the remaining 70% is due before shipping. If you have a representative in China, you can arrange an RMB transfer through them. |
| Q: What Shipping Methods Do We Use? |
| A: We primarily use FedEx, DHL, UPS, and BRE for shipping. If you have an account with any of these carriers, you can handle shipping directly. We also offer free shipping to China-based freight forwarders. |
| Q: What Is Our Delivery Time? |
| A: Delivery usually takes 1-3 days after receiving the initial payment. For items with a lead time, shipping will occur according to the specified schedule. |
| Q: How Do We Package the Goods? |
| A: We ensure safe packaging with multiple layers of protection. Products are first placed in their original boxes and sealed with labels. A layer of bubble wrap is then added for collision protection during transit. Finally, the items are packed securely in durable boxes. |
| Q: How Can Customers Contact Us and Request a Quote? |
| A: You can reach out to us via email, WhatsApp, WeChat, Skype, or your preferred communication platform. Contact us with your needs, and we'll provide a prompt, customized quote. |
