DS200PCCAG5ACB Power Connect Board General Electric

DS200PCCAG5ACB Power Connect Board General Electric
DS200PCCAG5ACB Power Connect Board General Electric
DS200PCCAG5ACB Power Connect Board General Electric
DS200PCCAG5ACB Power Connect Board General Electric
DS200PCCAG5ACB Power Connect Board General Electric
DS200PCCAG5ACB Power Connect Board General Electric

DS200PCCAG5ACB Power Connect Board General Electric

This DS200PCCAG5ACB Power Connect Board was manufactured by GE FANUC, In Stock, 100% Guaranteed Brand New and Authentic. Link to More Information

 
Manufacturer:
GE FANUC
Part Number:
DS200PCCAG5ACB
Product type:
Country of Origin:
USA
Condition:
New With Original Package
Shipping Port:
ShangHai, Xiamen
Warranty:
12 Months
Collections:
 

The General Electric DS200PCCAG5ACB, also cataloged as the DS200PCCAG5ACB Power Connect Card (PCCA), operates as a dedicated hardware component for power signal routing within industrial control networks.

Suffix Breakdown & Model Matrix

  • DS200: Indicates the industrial control assembly series.
  • PCCA: Specifies the Power Connect Card functional designation.
  • G5: Denotes the hardware generation or revision level.
  • ACB: Defines the specific technical iteration and board layout version.

Hardware Specifications

Parameter Specification
Model DS200PCCAG5ACB
Brand General Electric
Origin USA
Weight 0.4 kg
Dimensions 4.0 cm x 18.6 cm x 26.1 cm
Operating Temp 0 deg C to 60 deg C
Power Consumption Dependent on system load
Module Type Power Connect Card

Backplane Bus and Firmware Compatibility

The General Electric DS200PCCAG5ACB facilitates deterministic power distribution across the rack architecture. It requires precise backplane bus communication velocity to maintain stability in voltage delivery to peripheral components. Firmware flash compatibility is managed via the host controller interface; technicians must confirm the host backplane supports the G5 hardware revision before deployment. The board is designed to interface directly with the control rack backplane, ensuring that power signals are routed to the appropriate logic circuits without latency or signal degradation.

Frequently Asked Questions (FAQ)

Q: Can this power connect board be hot-swapped while the system is under load?

A: No. Hot-swapping is not supported. The control rack power must be fully isolated before installing or removing the board to prevent electrical transient damage to the backplane pins and board components.

Q: How is the physical connection to the backplane maintained?

A: The board utilizes high-density backplane connectors that provide a secure mechanical and electrical interface, ensuring continuity for power distribution circuits.

Field Installation Guidelines

  1. Preparation: Ensure the control rack is completely de-energized. Use an anti-static wrist strap to protect the module from electrostatic discharge.
  2. Mounting: Align the DS200PCCAG5ACB with the rack guide rails. Ensure the unit is seated firmly so the backplane connectors are fully engaged.
  3. Mechanical Fastening: Secure the module faceplate to the rack chassis using the integrated screws to ensure structural integrity and proper electrical continuity.
  4. Verification: After installation, perform a final check of all backplane connections. Energize the system and observe the diagnostic LEDs to confirm the module is initialized and routing power to the expected load circuits.
Quick Quotes Receive price & availability FAST from our dedicated customer service team.
Delivery Expedited, Freight, And International Shipping Available.
Condition 100% New with Original Package
Payment We accept American Express, Discover, MasterCard, PayPal, and Visa. Our site is secured by RapidSSL.
Shipping Port ShangHai, Xiamen
Warranty 12 Months
Q: Is Our Pricing Competitive?
A: Yes, we collaborate with over 50 countries worldwide. As a top supplier in China, we offer significant discounts based on market trends.
Q: What Is the Warranty Period?
A: All our new and original products come with a standard one-year warranty.
Q: What Payment Methods Do We Accept?
A: We require 100% T/T (Telegraphic Transfer) payment before shipping. For items with a lead time, a 30% deposit is needed upfront, and the remaining 70% is due before shipping. If you have a representative in China, you can arrange an RMB transfer through them.
Q: What Shipping Methods Do We Use?
A: We primarily use FedEx, DHL, UPS, and BRE for shipping. If you have an account with any of these carriers, you can handle shipping directly. We also offer free shipping to China-based freight forwarders.
Q: What Is Our Delivery Time?
A: Delivery usually takes 1-3 days after receiving the initial payment. For items with a lead time, shipping will occur according to the specified schedule.
Q: How Do We Package the Goods?
A: We ensure safe packaging with multiple layers of protection. Products are first placed in their original boxes and sealed with labels. A layer of bubble wrap is then added for collision protection during transit. Finally, the items are packed securely in durable boxes.
Q: How Can Customers Contact Us and Request a Quote?
A: You can reach out to us via email, WhatsApp, WeChat, Skype, or your preferred communication platform. Contact us with your needs, and we'll provide a prompt, customized quote.
 

Recently Viewed

Express Shipping icon
Express Shipping
Rapid delivery for your urgent requirements.
Large stock icon
Extensive Inventory
Large stock for immediate dispatch.
Quality Assurance Icon
Quality Assurance
Authentic, top-grade PLC & DCS components.
Global Service icon
Global Service
Supporting clients worldwide with dependable service.