Configured for high-precision turbine overspeed monitoring, the GE DS200TCEAG1A (DS200TCEAG1AFB Overspeed Protection Board) provides direct physical and electrical execution of speed sensing and trip annunciation. The module utilizes three independent magnetic pickup (MPU) conditioner circuits to process frequency inputs across the 0.5 Hz to 10 kHz range within turbine control networks.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | DS200TCEAG1A / DS200TCEAG1AFB |
| Brand | GE |
| Origin | USA |
| Weight | 0.7 kg |
| Dimensions | 22 cm x 16 cm x 4.5 cm |
| Operating Temp | 0 deg C to 60 deg C |
| Power Consumption | 24 VDC at 200 mA |
| Speed Channels | 3 Independent MPU inputs |
| Input Frequency | 0.5 Hz to 10 kHz |
TSI and Mechanical Monitoring Characteristics
The GE DS200TCEAG1A is dedicated to machinery protection, specifically targeting rotor dynamics and overspeed event detection. The onboard signal conditioners perform critical rotor dynamics verification, ensuring that the input frequency from the magnetic pickups is accurately scaled and processed by the comparators. Cross-talk suppression is maintained across the three independent channels to prevent signal interference from adjacent monitoring probes. Furthermore, the board performs real-time gap voltage validation indirectly by ensuring the magnetic pickup signal amplitude remains within the threshold required for stable frequency counting, thereby ensuring fail-safe state execution during turbine speed excursions.
Frequently Asked Questions
Q: Does this board support hot-swapping during turbine operation?
A: No. The backplane interface is not designed for hot-swapping. The control rack must be de-energized to prevent electrical faults or damage to the module pins during installation or extraction.
Q: How should the magnetic pickup wiring be terminated to prevent signal noise?
A: Use shielded twisted-pair cabling for all MPU connections. Ensure the shield is terminated at the designated ground terminal on the 10-pin terminal block to maintain signal integrity and minimize electromagnetic interference from high-voltage turbine systems.
Field Installation Guidelines
- Power Lockdown: Ensure the control rack is completely isolated from the power source before handling the module.
- Mounting: Secure the board into the designated rack slot. Tighten the captive fasteners to ensure robust mechanical stability and reliable electrical contact with the backplane.
- Wiring: Connect the three MPU sensors to the 10-pin terminal block. Verify that the input frequency signals are correctly wired to the respective channels according to the system schematic.
- Grounding: Connect the module chassis to the system earth ground. Ensure the grounding path is low-impedance to support the board's surge protection requirements.
- Verification: Upon re-energizing, use the control system software to confirm the input frequency signal is accurately captured across all three channels and that the trip annunciation relay responds to the configured speed setpoints.
| Quick Quotes | Receive price & availability FAST from our dedicated customer service team. |
|---|---|
| Delivery | Expedited, Freight, And International Shipping Available. |
| Condition | 100% New with Original Package |
| Payment | We accept American Express, Discover, MasterCard, PayPal, and Visa. Our site is secured by RapidSSL. |
| Shipping Port | ShangHai, Xiamen |
| Warranty | 12 Months |
| Q: Is Our Pricing Competitive? |
| A: Yes, we collaborate with over 50 countries worldwide. As a top supplier in China, we offer significant discounts based on market trends. |
| Q: What Is the Warranty Period? |
| A: All our new and original products come with a standard one-year warranty. |
| Q: What Payment Methods Do We Accept? |
| A: We require 100% T/T (Telegraphic Transfer) payment before shipping. For items with a lead time, a 30% deposit is needed upfront, and the remaining 70% is due before shipping. If you have a representative in China, you can arrange an RMB transfer through them. |
| Q: What Shipping Methods Do We Use? |
| A: We primarily use FedEx, DHL, UPS, and BRE for shipping. If you have an account with any of these carriers, you can handle shipping directly. We also offer free shipping to China-based freight forwarders. |
| Q: What Is Our Delivery Time? |
| A: Delivery usually takes 1-3 days after receiving the initial payment. For items with a lead time, shipping will occur according to the specified schedule. |
| Q: How Do We Package the Goods? |
| A: We ensure safe packaging with multiple layers of protection. Products are first placed in their original boxes and sealed with labels. A layer of bubble wrap is then added for collision protection during transit. Finally, the items are packed securely in durable boxes. |
| Q: How Can Customers Contact Us and Request a Quote? |
| A: You can reach out to us via email, WhatsApp, WeChat, Skype, or your preferred communication platform. Contact us with your needs, and we'll provide a prompt, customized quote. |
