The GE IS200TVIBH2BCC, also cataloged as the TVIB Vibration Terminal Board, operates as a dedicated hardware component for signal termination and conditioning within Mark VI vibration monitoring system platforms.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | IS200TVIBH2BCC |
| Brand | General Electric |
| Origin | USA |
| Weight | 0.8 kg |
| Dimensions | 147 mm x 95 mm x 35 mm |
| Operating Temp | -30 deg C to +65 deg C |
| Mounting | Panel mount |
| Function | Vibration sensor signal termination |
GE Mark VI Vibration Monitoring Architecture
The TVIB board serves as the critical interface between dynamic vibration sensors and the Mark VI vibration input modules. Utilizing high-speed backplane bus communication velocity, the board facilitates the deterministic transmission of high-frequency dynamic signals. The board supports I/O density scaling, allowing for the precise termination of multiple eddy-current probes or seismic sensors. As a vital component in the TSI (Turbine Supervisory Instrumentation) chain, it ensures signal integrity through EMI-resistant terminal routing, supporting the necessary bandwidth for advanced rotor dynamics analysis and cross-talk suppression.
Frequently Asked Questions (FAQ)
Q: What is the significance of the signal routing on the TVIB board regarding eddy-current probe scaling?
A: The TVIB is engineered to maintain the integrity of raw signal voltages from eddy-current probes. Proper routing on this board ensures that the -10 VDC gap voltage targets remain stable, preventing measurement inaccuracies during rotor dynamic monitoring.
Q: Can this board be used for applications involving high-frequency dynamic signals?
A: Yes, the TVIB board is specifically designed to handle the high-frequency requirements of turbine vibration monitoring, providing low-impedance paths that minimize signal attenuation and distortion across the frequency spectrum.
Field Installation Guidelines
- Mounting: Secure the TVIB board to the vibration monitoring cabinet panel using the provided mounting holes. Ensure the panel is grounded to the common system reference to prevent ground-loop noise.
- Shielding: All vibration sensor cabling must be shielded. Terminate the shield drain wire at the designated chassis grounding point on the terminal board to ensure effective suppression of high-frequency noise.
- Torque Settings: Tighten all terminal screw connections to the manufacturer’s specified torque. Loose connections in vibration circuits can introduce signal jitter, which may be misinterpreted by the control system as mechanical vibration.
- Visual Inspection: Verify that all input channels are correctly wired according to the loop diagram. Ensure no metallic debris or wire strands exist near the signal traces to prevent short circuits on the low-voltage sensor inputs.
| Quick Quotes | Receive price & availability FAST from our dedicated customer service team. |
|---|---|
| Delivery | Expedited, Freight, And International Shipping Available. |
| Condition | 100% New with Original Package |
| Payment | We accept American Express, Discover, MasterCard, PayPal, and Visa. Our site is secured by RapidSSL. |
| Shipping Port | ShangHai, Xiamen |
| Warranty | 12 Months |
| Q: Is Our Pricing Competitive? |
| A: Yes, we collaborate with over 50 countries worldwide. As a top supplier in China, we offer significant discounts based on market trends. |
| Q: What Is the Warranty Period? |
| A: All our new and original products come with a standard one-year warranty. |
| Q: What Payment Methods Do We Accept? |
| A: We require 100% T/T (Telegraphic Transfer) payment before shipping. For items with a lead time, a 30% deposit is needed upfront, and the remaining 70% is due before shipping. If you have a representative in China, you can arrange an RMB transfer through them. |
| Q: What Shipping Methods Do We Use? |
| A: We primarily use FedEx, DHL, UPS, and BRE for shipping. If you have an account with any of these carriers, you can handle shipping directly. We also offer free shipping to China-based freight forwarders. |
| Q: What Is Our Delivery Time? |
| A: Delivery usually takes 1-3 days after receiving the initial payment. For items with a lead time, shipping will occur according to the specified schedule. |
| Q: How Do We Package the Goods? |
| A: We ensure safe packaging with multiple layers of protection. Products are first placed in their original boxes and sealed with labels. A layer of bubble wrap is then added for collision protection during transit. Finally, the items are packed securely in durable boxes. |
| Q: How Can Customers Contact Us and Request a Quote? |
| A: You can reach out to us via email, WhatsApp, WeChat, Skype, or your preferred communication platform. Contact us with your needs, and we'll provide a prompt, customized quote. |
