Configured for high-precision signal conditioning and data acquisition in Mark V Speedtronic turbine control platforms, the General Electric DS200TCCBGBBED (DS200TCCBGBBED Extended Analog I/O Board) provides direct physical/electrical execution of complex analog signal processing loops.
Suffix Breakdown & Model Matrix
The DS200TCCBGBBED utilizes a specific alphanumeric coding system to denote hardware revision and functional capability. The "BGB" segment identifies the core I/O configuration for mixed analog inputs/outputs, while the "BED" suffix indicates the latest assembly iteration compatible with the Intel 80196 microprocessor architecture and expanded communication protocol firmware.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | DS200TCCBGBBED |
| Brand | General Electric |
| Origin | USA |
| Weight | 0.66kg |
| Dimensions | Not specified |
| Operating Temp | -40 deg C to +85 deg C |
| Power Consumption | 24 VDC nominal |
| Processor | Intel 80196 |
| Memory | 256 MB |
| Signal Inputs | RTD, 4-20 mA |
| Signal Outputs | 0-10 V |
Profinet / EtherNet/IP Deterministic Networks
The DS200TCCBGBBED leverages integrated communication protocols including Modbus TCP/IP, Profibus-DP, and Ethernet to maintain deterministic data flow. The onboard Intel 80196 processor ensures that real-time signal processing requirements are met without bottlenecking the backplane bus. Communication latencies are minimized through hardware-level firmware management, facilitating high-speed data exchange between field RTD/4-20 mA sensors and the primary turbine controller.
Frequently Asked Questions
Q: Can this module be hot-swapped during active turbine operation?
A: No, the DS200TCCBGBBED is not designed for live insertion. Removing or installing the board while the backplane is energized may result in electrical damage to the connectors or internal processing components.
Q: How should the board be configured for different input signal types?
A: Signal type selection is managed through both hardware jumpers on the PCB and software configuration within the Mark V control suite. Ensure that field wiring matches the software-assigned channel mapping before applying power.
Field Installation Guidelines
- Perform a full system shutdown and verify that the 24 VDC rack power is de-energized.
- Inspect the JCC and JDD 50-pin connectors for any bent or obstructed pins prior to insertion.
- Slide the module into the designated slot, ensuring the board aligns accurately with the card guides.
- Seat the board firmly into the backplane; secure the front faceplate to the rack frame using the provided mounting hardware to ensure adequate electrical bonding.
- Terminate all field cables, ensuring that RTD and analog loop shields are landed on the appropriate ground terminals to suppress electromagnetic noise.
- Verify the ambient operating environment remains within the specified range of -40 deg C to +85 deg C to prevent thermal degradation of the onboard memory and processor.
| Quick Quotes | Receive price & availability FAST from our dedicated customer service team. |
|---|---|
| Delivery | Expedited, Freight, And International Shipping Available. |
| Condition | 100% New with Original Package |
| Payment | We accept American Express, Discover, MasterCard, PayPal, and Visa. Our site is secured by RapidSSL. |
| Shipping Port | ShangHai, Xiamen |
| Warranty | 12 Months |
| Q: Is Our Pricing Competitive? |
| A: Yes, we collaborate with over 50 countries worldwide. As a top supplier in China, we offer significant discounts based on market trends. |
| Q: What Is the Warranty Period? |
| A: All our new and original products come with a standard one-year warranty. |
| Q: What Payment Methods Do We Accept? |
| A: We require 100% T/T (Telegraphic Transfer) payment before shipping. For items with a lead time, a 30% deposit is needed upfront, and the remaining 70% is due before shipping. If you have a representative in China, you can arrange an RMB transfer through them. |
| Q: What Shipping Methods Do We Use? |
| A: We primarily use FedEx, DHL, UPS, and BRE for shipping. If you have an account with any of these carriers, you can handle shipping directly. We also offer free shipping to China-based freight forwarders. |
| Q: What Is Our Delivery Time? |
| A: Delivery usually takes 1-3 days after receiving the initial payment. For items with a lead time, shipping will occur according to the specified schedule. |
| Q: How Do We Package the Goods? |
| A: We ensure safe packaging with multiple layers of protection. Products are first placed in their original boxes and sealed with labels. A layer of bubble wrap is then added for collision protection during transit. Finally, the items are packed securely in durable boxes. |
| Q: How Can Customers Contact Us and Request a Quote? |
| A: You can reach out to us via email, WhatsApp, WeChat, Skype, or your preferred communication platform. Contact us with your needs, and we'll provide a prompt, customized quote. |
