Configured for high-density I/O processing and signal management in Mark VI platforms, the General Electric IS200AEPGG1A (IS200AEPGG1A Board Assembly) provides direct physical/electrical execution of complex control logic and communication tasks.
Suffix Breakdown & Model Matrix
- IS200: Standard hardware series designation for GE Mark VI control components.
- AEPG: Analog Electronic Processor Gateway circuit architecture.
- G1A: Revision identifier; indicates the primary hardware iteration for the AEPG module interface.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | IS200AEPGG1A |
| Brand | General Electric |
| Origin | USA |
| Weight | 0.44 kg |
| Dimensions | 15.8 cm x 11.5 cm x 2.1 cm |
| Operating Temp | -25 deg C to +70 deg C |
| Power Consumption | 5.8 W at 24 VDC |
| Analog Inputs | 16 channels |
| Digital Outputs | 8 channels |
| Processor | 200 MHz ARM Cortex-M4 |
Profinet / EtherNet/IP Deterministic Networks
The IS200AEPGG1A integrates into the Mark VI control environment to manage analog front-end data acquisition and deterministic communication tasks. Utilizing the 200 MHz ARM Cortex-M4 processor, the module maintains backplane bus communication velocity across its 4 configurable ports, supporting Modbus and Profibus protocols. The board architecture includes an onboard 3.3 V supercapacitor, providing 48-hour backup for critical volatile data. Its high-density design, featuring 156 total components, supports I/O density scaling while ensuring firmware flash compatibility for real-time control adjustments.
Frequently Asked Questions
Q: Can the onboard 3.3 V supercapacitor be replaced if it fails to hold a charge?
A: The supercapacitor is a soldered surface-mount component integral to the PCB assembly. It is not intended for field replacement; if the 48-hour backup capability is lost, the entire board assembly must be inspected or replaced.
Q: How should I manage the 2.6 A inrush current during startup?
A: Ensure that the 24 VDC power supply used in the control cabinet is rated to accommodate the specified inrush current to prevent voltage sagging and potential communication timeouts during the power-on sequence.
Field Installation Guidelines
- Ensure the control cabinet is de-energized and grounded before handling the IS200AEPGG1A to mitigate electrostatic discharge risks.
- Secure the board assembly using the designated mounting points, ensuring the PCB is not flexed during installation.
- Terminate analog and digital signal cables using shielded wiring to minimize noise ingress into the 16 analog input channels.
- Verify communication port settings via the engineering workstation to align with site-specific Modbus or Profibus network topography.
- Check all connection points for mechanical integrity post-installation to prevent intermittent signal drops caused by vibration.
| Quick Quotes | Receive price & availability FAST from our dedicated customer service team. |
|---|---|
| Delivery | Expedited, Freight, And International Shipping Available. |
| Condition | 100% New with Original Package |
| Payment | We accept American Express, Discover, MasterCard, PayPal, and Visa. Our site is secured by RapidSSL. |
| Shipping Port | ShangHai, Xiamen |
| Warranty | 12 Months |
| Q: Is Our Pricing Competitive? |
| A: Yes, we collaborate with over 50 countries worldwide. As a top supplier in China, we offer significant discounts based on market trends. |
| Q: What Is the Warranty Period? |
| A: All our new and original products come with a standard one-year warranty. |
| Q: What Payment Methods Do We Accept? |
| A: We require 100% T/T (Telegraphic Transfer) payment before shipping. For items with a lead time, a 30% deposit is needed upfront, and the remaining 70% is due before shipping. If you have a representative in China, you can arrange an RMB transfer through them. |
| Q: What Shipping Methods Do We Use? |
| A: We primarily use FedEx, DHL, UPS, and BRE for shipping. If you have an account with any of these carriers, you can handle shipping directly. We also offer free shipping to China-based freight forwarders. |
| Q: What Is Our Delivery Time? |
| A: Delivery usually takes 1-3 days after receiving the initial payment. For items with a lead time, shipping will occur according to the specified schedule. |
| Q: How Do We Package the Goods? |
| A: We ensure safe packaging with multiple layers of protection. Products are first placed in their original boxes and sealed with labels. A layer of bubble wrap is then added for collision protection during transit. Finally, the items are packed securely in durable boxes. |
| Q: How Can Customers Contact Us and Request a Quote? |
| A: You can reach out to us via email, WhatsApp, WeChat, Skype, or your preferred communication platform. Contact us with your needs, and we'll provide a prompt, customized quote. |
