Honeywell 05425001 054250-01 TDC 3000 Termination Boards
Configured for field wiring interconnections in TDC 3000 systems, the Honeywell 05425001 054250-01 (05425001 Termination Board) provides direct physical/electrical execution. This compact interface board establishes electrical contact points between field instrumentation wiring and internal DCS control processors. Housed in a durable plastic structure measuring 25.9 x 19.3 x 1.0 cm, the unit organizes field conductors across multiple terminal points to streamline signal routing and prevent cross-wiring errors inside high-density control cabinets.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | 05425001 |
| Part Number | 054250-01 |
| Brand | Honeywell |
| Category | Termination Boards |
| Origin | USA |
| Weight | 0.09 kg |
| Dimensions | 25.9 x 19.3 x 1.0 cm |
| Operating Temp | -40 to 85 deg C |
| Power Consumption | Passive (no direct power draw) |
| Mounting Type | Panel / Rack Mounting |
| Housing Material | High thermal tolerance plastic |
| System Platform | Honeywell TDC 3000 |
DCS Process Control & Interface Wiring
The termination assembly routes field instrument signals to system processing hardware using passive electrical connections. Built-in channel-to-channel isolation layouts prevent inter-channel cross-talk and maintain signal purity across parallel wiring runs. The board operates under 4-20 mA HART signal protocol environments and accommodates discrete control circuits without introducing signal distortion or loop resistance shifts. Thermal tolerance across -40 to 85 deg C ensures stable electrical contact resistance even under elevated enclosure temperatures.
Frequently Asked Questions
Q: Does this passive termination board consume power from the backplane?
A: No, the board functions as a passive physical interface board for signal routing and does not draw operational power from the system backplane.
Q: What grounding precautions must technicians follow when landing shielded field cables on this board?
A: Technicians must terminate overall cable shield drain wires directly at the central cabinet earth ground bar rather than floating them on unused terminal points to prevent ground loop noise.
Field Installation Guidelines
Mount the termination board securely inside the control cabinet using designated panel retention screws. Strip incoming field wires to 6 mm and secure them into the terminal connection points, verifying tight mechanical contact without over-torqueing the screw clamps. Route field signal cables away from high-voltage AC lines by maintaining a minimum separation distance of 300 mm to prevent electromagnetic interference. Ensure that all shield drain wires connect directly to a single cabinet ground point to eliminate ground potential differentials.
| Quick Quotes | Receive price & availability FAST from our dedicated customer service team. |
|---|---|
| Delivery | Expedited, Freight, And International Shipping Available. |
| Condition | 100% New with Original Package |
| Payment | We accept American Express, Discover, MasterCard, PayPal, and Visa. Our site is secured by RapidSSL. |
| Shipping Port | ShangHai, Xiamen |
| Warranty | 12 Months |
| Q: Is Our Pricing Competitive? |
| A: Yes, we collaborate with over 50 countries worldwide. As a top supplier in China, we offer significant discounts based on market trends. |
| Q: What Is the Warranty Period? |
| A: All our new and original products come with a standard one-year warranty. |
| Q: What Payment Methods Do We Accept? |
| A: We require 100% T/T (Telegraphic Transfer) payment before shipping. For items with a lead time, a 30% deposit is needed upfront, and the remaining 70% is due before shipping. If you have a representative in China, you can arrange an RMB transfer through them. |
| Q: What Shipping Methods Do We Use? |
| A: We primarily use FedEx, DHL, UPS, and BRE for shipping. If you have an account with any of these carriers, you can handle shipping directly. We also offer free shipping to China-based freight forwarders. |
| Q: What Is Our Delivery Time? |
| A: Delivery usually takes 1-3 days after receiving the initial payment. For items with a lead time, shipping will occur according to the specified schedule. |
| Q: How Do We Package the Goods? |
| A: We ensure safe packaging with multiple layers of protection. Products are first placed in their original boxes and sealed with labels. A layer of bubble wrap is then added for collision protection during transit. Finally, the items are packed securely in durable boxes. |
| Q: How Can Customers Contact Us and Request a Quote? |
| A: You can reach out to us via email, WhatsApp, WeChat, Skype, or your preferred communication platform. Contact us with your needs, and we'll provide a prompt, customized quote. |
