The General Electric IS200TBTCH1C, also cataloged as the IS200TBTCH1 Thermocouple Terminal Board, operates as a dedicated hardware component for field-level temperature signal termination and cold junction compensation (CJC) within Mark VI turbine control systems.
Suffix Breakdown & Model Matrix
The IS200TBTCH1C utilizes the GE standardized hardware nomenclature. The "IS200" prefix identifies the component as part of the Mark VI series. The "TBTC" designator denotes the board function as a thermocouple terminal interface. The "H1" identifies the primary hardware iteration, while the "/C" suffix indicates the board revision level, which dictates specific wiring terminal configurations and compatibility with CJC sensing hardware.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | IS200TBTCH1C |
| Brand | General Electric |
| Origin | USA |
| Weight | 1.8 kg |
| Dimensions | 330 mm x 200 mm x 100 mm |
| Operating Temp | 0 deg C to 60 deg C |
| Power Consumption | < 5 W |
| Function | Thermocouple Termination & CJC |
4-20 mA HART Loop Protocol
The IS200TBTCH1C is engineered for high-precision thermocouple signal processing. It incorporates specialized cold junction compensation (CJC) circuitry on each terminal block, ensuring that millivolt-level temperature signals are accurately referenced before being passed to the control rack. The board provides channel-to-channel isolation, minimizing the impact of potential ground loops across disparate thermocouple inputs. This ensures that the low-level signal integrity is maintained before analog-to-digital conversion within the I/O processor module, preventing thermal measurement drift in turbine monitoring loops.
Frequently Asked Questions
Q: Does the IS200TBTCH1C require specific thermocouple extension wire types?
A: Yes. The board is designed for use with specific thermocouple alloy extension wires. Using incompatible wire types will introduce lead-wire error and invalidate the cold junction compensation accuracy.
Q: Is this board hot-swappable while the turbine control system is active?
A: No. The terminal board must be serviced only when the associated control rack is de-energized to prevent short-circuiting input channels or damaging the CJC thermistor assemblies during wiring adjustment.
Field Installation Guidelines
- Cabinet Mounting: Mount the board within a grounded, enclosed turbine control cabinet. Secure all mounting hardware to prevent mechanical resonance from turbine vibration.
- Cold Junction Compensation: Ensure the CJC thermistor is correctly seated in the terminal block assembly. Improper seating will result in significant temperature reading offsets and system alarm triggers.
- Shielding and Grounding: Terminate all thermocouple cable shields to the cabinet's designated ground bus bar. Do not connect shields to the board's signal common, as this can create ground loops and degrade measurement accuracy.
- Wiring Separation: Maintain a minimum separation of 50 mm between thermocouple signal lines and high-voltage power lines to prevent induced electrical noise from impacting sensitive millivolt readings.
| Quick Quotes | Receive price & availability FAST from our dedicated customer service team. |
|---|---|
| Delivery | Expedited, Freight, And International Shipping Available. |
| Condition | 100% New with Original Package |
| Payment | We accept American Express, Discover, MasterCard, PayPal, and Visa. Our site is secured by RapidSSL. |
| Shipping Port | ShangHai, Xiamen |
| Warranty | 12 Months |
| Q: Is Our Pricing Competitive? |
| A: Yes, we collaborate with over 50 countries worldwide. As a top supplier in China, we offer significant discounts based on market trends. |
| Q: What Is the Warranty Period? |
| A: All our new and original products come with a standard one-year warranty. |
| Q: What Payment Methods Do We Accept? |
| A: We require 100% T/T (Telegraphic Transfer) payment before shipping. For items with a lead time, a 30% deposit is needed upfront, and the remaining 70% is due before shipping. If you have a representative in China, you can arrange an RMB transfer through them. |
| Q: What Shipping Methods Do We Use? |
| A: We primarily use FedEx, DHL, UPS, and BRE for shipping. If you have an account with any of these carriers, you can handle shipping directly. We also offer free shipping to China-based freight forwarders. |
| Q: What Is Our Delivery Time? |
| A: Delivery usually takes 1-3 days after receiving the initial payment. For items with a lead time, shipping will occur according to the specified schedule. |
| Q: How Do We Package the Goods? |
| A: We ensure safe packaging with multiple layers of protection. Products are first placed in their original boxes and sealed with labels. A layer of bubble wrap is then added for collision protection during transit. Finally, the items are packed securely in durable boxes. |
| Q: How Can Customers Contact Us and Request a Quote? |
| A: You can reach out to us via email, WhatsApp, WeChat, Skype, or your preferred communication platform. Contact us with your needs, and we'll provide a prompt, customized quote. |
